
Efficient, damage-free demolition with a revolutionary machine
Time is precious, and the same is true in the construction industry.

Un train-usine géant pour renouveler une ligne à grande vitesse

Renovation of a railway bridge vital to freight traffic

Expanding its skills network in Wallonia

Face aux excès du climat, le rail belge continue de s’adapter

Rail works made safer with a mobile radio warning system

Diversifying across the board

Techni-Mat: innovation and collaboration in the construction sector

Sustainable, optimised rainwater management system for a new joinery workshop

Use of high-performance surface dressings (HPSDs) and large-area coloured road markings

From the Francorchamps road through the village to the Water Highway

A royal route for fish at the new Ampsin-Neuville lock complex

E25/A25 urban boulevard conversion works: new underpass opens

A safe area for the emergency services, created with retaining walls

Driving through a wadi? It’s possible!

Geotextiles: technological advances in the service of ecology

Five years of BENOR-certified road concrete: a milestone

CRR puts Pradoweb on the road to sustainability

Liège: liaison E25-E40/A602 : la modernisation du tunnel de Cointe vers le Luxembourg s’achève, réouverture le 28 août

Your Roads Tomorrow: the future of our infrastructure

Macro- and microfibres for durable, fire-resistant reinforced concrete infrastructure

A young company on the right track

Execution certification continues to gain ground

Bierset ecocentre helps you kill two birds with one stone
The best of Construire la Wallonie in your inbox every two weeks.
- Projects, products, solutions and partners
- The most interesting industry developments
- Free and without further obligation
Sign up for free
In your inbox every fortnight.










