Restoring the beating heart of the city of the Doudou

Façades, masonry, insulation and roofs feature in the first phase of the restoration and energy renovation of Mons City Hall, while the second phase involved restoring the reception rooms, a project that brought together a wide range of trades. Galère has been on site since the first works to the building’s external envelope, bringing the expertise of its restoration team to bear. This long-term project combines heritage constraints with those of a central venue where the heart of life in Mons continues to beat.

From the external envelope to the reception rooms

The City Hall comprises a complex of buildings, some dating back to the 15th, 17th and 18th centuries. The complex is listed as exceptional heritage. Commissioned by the City with support from the 2014-2020 ERDF programme, the restoration and energy renovation of the complex is continuing under the 2021-2027 ERDF programme. The aim is, among other things, to reduce energy losses while respecting the characteristics of the historic building.

During the first phase, Galère took on four of the five packages relating to the external envelope, explains Bertrand Bonmariage, head of the D24 team: the main façade, the roof of the central building and the roofs of the buildings on either side. “All the masonry work, repairs and stone replacement were carried out by our own specialist workforce, apart from the stone carving, which was done by our partner subcontractor, l’Atelier de Sculpture srl,” he says.

The particularly ornate Gothic façade required a meticulous approach. As the original source, the Pierre de Bray quarry, is no longer in operation, a quarry in the Vosges was selected for its stones’ similar characteristics. Samples and trial pieces were submitted to the steering committee to identify the right colours, sizes and characteristics. “That is what makes restoration so specific: decisions are often made on site, in consultation with everyone involved.”

Restaurer le cœur battant de la cité du Doudou

Restoration that respects diversity

The next stage involved restoring 8 historic reception rooms, each one different. Parquet flooring, stone and marble, panelling, tapestries, paintings, a ceiling canvas marouflaged in place, painted decoration, stucco, fibrous plasterwork, drapes, mouldings and gilding: the variety of features called for a wide range of specialist craftspeople. At the same time, electrical systems, fire detection and the equipment required for the scenography were integrated with minimal visual impact, while incorporating the latest technology, particularly for building automation.

“Sometimes we had to remove panelling, follow the brick joints and route cables wherever we could to keep them hidden,” explains Bertrand Bonmariage. This overlapping work by restorers, gilders, painters, fibrous plaster specialists and technicians was one of the project’s biggest challenges, made possible only by a shared determination to pull off an ambitious undertaking. The limited availability and working schedules of some craftspeople also required close coordination.

Working around life on the Grand-Place

The schedule presented another challenge. Weddings, administrative activities and events on the Grand-Place regularly require the work to be reorganised. During the Doudou, for example, some installations have to be dismantled or significantly scaled back. “The project has to adapt to and fit in with all the activity in Mons,” says Bertrand Bonmariage.

Work is now continuing on the buildings at the rear, including the slate roofs, floor insulation and copper and zinc elements. This phase of the project is expected to last another 3 years.

Restaurer le cœur battant de la cité du Doudou

A landmark project

For Galère’s D24 team, which has around ten employees and fifty workers, the work at Mons City Hall is a landmark project because it brings together practically every trade: structural work, stone dressing, roofing, finishing and metalwork. It also has particular emotional significance for workers from the area. “Some were proud to be able to work on a building that means something to them,” concludes Bertrand Bonmariage.

Restaurer le cœur battant de la cité du Doudou

PROJECT DETAILS

  • Client: City of Mons
  • Project designer
  • Cabinet d’Architectes p.HD
  • Structural engineer: Bureau d’Etudes GREISCH
  • Main contractor: Galère

Question about this story? Ask your question

Keep following this

Get an email when a new story is published. No account needed.

What you follow
  • ThemeRenovating existing buildings
  • SubjectHainaut
Share this article

Advertisement

Follow on Construire la Wallonie

Follow

Follow a project or company and you’ll receive an email whenever a new story appears. Follow a theme or topic and you’ll receive a weekly roundup. No account or password needed: every email includes a link to what you follow.