Construction

A project delivered with distinction, against the grain of conventional practice

Texte Philippe Selke Photos SA Dethier

L’installation d’une chaufferie de secours composée de trois chaudières de 300 kW fut pour la SA Dethier un premier succès.
L’installation d’une chaufferie de secours composée de trois chaudières de 300 kW fut pour la SA Dethier un premier succès.

Van der Valk Luxembourg in Arlon is continuing to expand, with a new extension now in service featuring 56 new rooms, indoor and outdoor pools and a very large wellness area. A restaurant will soon follow, then, at a later stage, a wave pool unique in the Benelux. To deliver this ambitious project, SA Dethier, a family-run company with decades of experience in HVAC, was appointed by the client to install all the necessary heating, cooling and energy infrastructure.

One of the project’s major innovations, outside SA Dethier’s remit, is the use of combined heat and power from an anaerobic digestion plant on a neighbouring farm. This provides the hotel and its facilities with a more sustainable energy supply. As a precaution, the system is backed up by a boiler room with three 300 kW boilers. This first project gave the client the chance to see what SA Dethier was capable of. The trial proved successful, securing the HVAC specialist the main contract. “We installed a hybrid energy system that makes the most of local resources while ensuring maximum efficiency,” explains David Close, HVAC Project Manager at the family-run company based in Waimes.

Six outdoor units for a 3-pipe VRV air-conditioning system were installed to ensure optimum comfort for hotel guests.

VRV and BMS

Six outdoor air-conditioning units were installed to ensure optimum comfort for hotel guests. “Installing a 3-pipe VRV system allows us to meet the specific needs of each room while ensuring maximum energy efficiency,” explains Sylvain Nix, Technician and Project Manager at Dethier. A building management system (BMS) was also deployed to monitor and optimise energy consumption in real time.

Reverse planning

For SA Dethier, the main challenge on this project was managing the schedule. Another major innovation was the use of prefabricated modules for the extension’s rooms, each containing two bedrooms and a section of corridor. This required the installations to be approached in reverse: “We had to plan all the building services before the modules were installed, which required extremely precise planning,” continues Sylvain Nix. Over three months, six technicians prepared the site in difficult weather conditions so that the infrastructure would be ready for the modules. These arrived on site fully equipped, with services already integrated, making them very quick to assemble. “The client chose this approach to save time, but it meant we had to make numerous adjustments,” the two experts point out. An 80-metre-long services tunnel was also built to create a district heating network between the existing facilities and the new extension.

“We had to plan all the building services before the modules were installed, which required extremely precise planning.”

Stronger client relationship

SA Dethier’s rigour and adaptability helped establish a relationship of trust with the client. This successful collaboration not only ensured that the work was completed to a very tight deadline, in less than a year, but also paved the way for future joint projects. “The client was pleased with our work, which led to discussions about future developments,” says SA Dethier. Meeting the deadlines was crucial. “We delivered the rooms in mid-September and the wellness area at the end of the year, with virtually no margin for error.”

An 80-metre-long services tunnel was built to create a district heating network between the existing facilities and the new extension.

Next steps and prospects

Work is continuing on the restaurant, while the spectacular wave pool is still at the planning stage. “We have already proposed technical solutions and are awaiting final discussions,” explains David Close. The client for Van der Valk Luxembourg in Arlon is also exploring new collaborations with SA Dethier on other large-scale projects.

“We pushed our limits and found new ways of working. This successful experience has strengthened our expertise and demonstrated our ability to adapt,” the two colleagues conclude.  

Question about this story? Ask your question

Keep following this

Get an email when a new story is published. No account needed.

What you follow
  • SubjectConstruction
Share this article

Advertisement

Follow on Construire la Wallonie

Follow

Follow a project or company and you’ll receive an email whenever a new story appears. Follow a theme or topic and you’ll receive a weekly roundup. No account or password needed: every email includes a link to what you follow.