At the end of 2024, Nelles took an important step in developing its activities by establishing a presence in Hermalle-sous-Argenteau with a new site bringing together a concrete batching plant, a recycling centre and a centre for consolidating excavated soil. Since August 2025, Nelles has invested there (taking 100% control, building a new BENOR-certified batching plant, buying trucks and developing a recycling centre) so that BNR (Béton Nelles Recyclage) can supply a large number of major projects in the Liège region.

Optimisation and adaptation for the Luminus battery park
Nelles is working on the Luminus battery park project in Visé, which we have already covered in this magazine. François Crutzen, site manager at Nelles: “We are responsible for the general earthworks and landscaping. We planned how to optimise the project in partnership with Cop & Portier, which is responsible for the civil engineering, from the first negotiations with Luminus at the tendering stage. The proximity of our BNR site has enabled us to be highly agile and responsive. During the first phase of the project, involving the construction of platforms, we first took demolition waste at Hermalle and supplied around 5000 tonnes of recycled crushed-concrete aggregate. This circular approach reduces the environmental impact and the need for virgin materials. We then supplied Cop & Portier with 1200 m3 of high-strength concrete, some lean concrete and stabilised material. Aggregate will be supplied for phase 3, covering the landscaping and roads. Aggregate had originally been specified for some specialist backfills, such as around structures. Nelles found a way to optimise this part of the project by replacing it with lime-treated soil from its Hermalle site.
The Nelles teams’ ability to adapt was once again put to the test on this project, which was a first for all parties involved. François Crutzen: “Recently, the company responsible for installing the batteries found that the levels specified in the project for some of the platforms were not ideal for lifting and handling the batteries. We had to respond very quickly, using our own surveyors to remodel the platforms. This required additional aggregate, which we delivered promptly from Hermalle-sous-Argenteau. Yet another example of how our proximity and agility work wonders, much to the appreciation of our partners Cop & Portier and Luminus!”
Anthony Scaglione, director at BNR and works director at Nelles, is pleased: “We started work on 3 March and knew that the platforms absolutely had to be delivered by the end of October to accommodate the batteries Luminus had ordered long in advance. We met the deadline!”

A step change in scale
Among Nelles’ main current and upcoming projects is the complete redevelopment of the Carrefour car park in Ans (18 000 m²), including demolition, drainage, a 1300 m³ underground stormwater basin and roads, for Redevco. Here too, Nelles proposed optimisations made possible by using products from its recycling centre in Hermalle.
BNR also supplies its clients with impressive quantities of concrete, including 9000 m3 for DEME Environnement’s future soil consolidation and treatment centre in Seraing, 5000 m3 of concrete for the Mobi’Park project in Tilleur, for the construction of a 26 000 m2 car park with a brushed finish, as well as 900 m3 of recycled stabilised sand for the same project, and 3500 m³ for the construction of the Van der Valk hotel in Bierset. Anthony Scaglione: “Compared with the annual output of a batching plant in the east of the country, these figures clearly represent a step change in scale. That, in turn, calls for additional staff. We have just hired a batching plant operator at the BNR site. A vacancy has been advertised for an administrative employee. We have also recently welcomed someone to oversee the quality of our various products, both concrete and aggregate.”
Anthony Scaglione concludes: “Although our BNR site gives us access to a potentially richer market for major projects, we need to keep our feet on the ground and remain modest. Others are doing what we are doing now, so we need to keep improving every time if we are to stay a step ahead.”

A business question for NELLES frères SA? Get in touch