A renovation whose coherence is rooted in the integration of the trades

The renovation of Quaregnon’s municipal workshops stands out for the simultaneous involvement of Sotrelco’s three departments: electrical, HVAC and plumbing, and construction. This integrated approach made it possible to address the technical, architectural and functional challenges coherently on a project representative of the issues facing an ageing public building stock.
Integrating new spaces into an existing structure was a major challenge, involving substantial steelwork, including staircases and prefabricated load-bearing elements whose installation had to preserve the stability of the retained structures. Several existing elements were refurbished by grit blasting, anti-corrosion treatment and fire protection. The façades were externally insulated and finished with brick slips.

Electrical infrastructure designed for current and future needs
The electrical installations were overhauled to provide a reliable, correctly sized power supply for the site’s machine tools, welding stations and saws. EV charging points were added during the project and incorporated without requiring major work on the main switchboard.
François Dequenne, Marketing Business Development at Sotrelco: “As this is a workshop with machinery, the work focused on accurately calculating power requirements, separating circuits and selecting suitable enclosures. While these were not really industrial constraints, we also took care to manage vibration and noise to prevent them being transmitted to the building structure.”
Emergency lighting is controlled automatically: statutory tests run automatically and their results are centralised, simplifying future operation.


Ventilation and comfort: energy efficiency at the heart of the choices
The HVAC systems were sized to ensure indoor air quality and energy performance. Heating is provided by two 28 kW MAXA i290 heat pumps running on R290 (propane), a natural refrigerant with a global warming potential (GWP) of no more than 0.02. With a SCOP of 4.46, they deliver more than 4 kWh of heat for every kWh consumed over the season and achieve A+++ at 35 °C. Their Full Inverter design adjusts output to actual demand and limits on-off cycles. They produce water at temperatures of up to 78 °C, an advantage in renovation projects, and their performance is Eurovent certified. As R290 is flammable, its installation requires great care: safety distances, ventilation of plant rooms and leak detection.
A Systemair Topvex TC air handling unit serves the workshops. Eurovent A+ certified and carrying the “Green Ventilation” label, it is the most efficient model in the range: a counterflow heat exchanger that recovers over 80 % of heat (EN 308), fans with very low specific fan power (SFP) and integrated Systemair Access controls. The galvanised steel ductwork remains exposed, contributing to the building’s industrial aesthetic, while demanding particular care in installation and acoustic treatment.

Controls: where the three trades come together
Coordination between Sotrelco’s departments was most crucial in the control systems. Fire safety takes precedence over everything: at the slightest detection of smoke, the supply and extract fans stop and the fire dampers close, wired on a fail-safe basis to operate even in the event of an electrical failure. Morning start-up reduces the airflow to the minimum hygienic level so that the setpoint is reached more quickly. During the day, control remains modulating: VAV dampers adjust airflow according to CO₂ and humidity sensors. Night-time free cooling depends on the weather: the BMS analyses temperature, wind and rain before opening the dampers or the heat exchanger bypass. Each of these sequences brings together HVAC, electrical systems and the building fabric, motorised openings in the envelope, volt-free contacts and BMS logic. This is where the involvement of all three departments proved its value.
By bringing together its three trades, Sotrelco has delivered a modernised, energy-efficient, decarbonised building whose performance will endure because the controls were conceived as the link between disciplines, not as a layer added at the end of the project.