A timber-framed business unit replaces steel

Texte Philippe Selke | Photos Duchêne

Dans le PAE de Modave, l’entreprise générale Duchêne (Groupe Eiffage) achève actuellement la construction d’un hall-relais de 810 m2 pour le compte de la SPI.
Dans le PAE de Modave, l’entreprise générale Duchêne (Groupe Eiffage) achève actuellement la construction d’un hall-relais de 810 m2 pour le compte de la SPI.

Based in the Modave Business Park (PAE), main contractor Duchêne (Eiffage Group) is currently completing an 810 m2 business unit for SPI. Each of the three units will provide future tenants with a combined workshop and office space, housed in a glued laminated timber structure instead of the 33 tonnes of steel originally specified. What prompted this change of direction, and, above all, how was it managed? We set out to find out…

“This building for SPI is probably one of the first industrial buildings Duchêne has built using a timber frame.” (Photo: JC Concept)

Quentin Crousse is the project architect: “When we drew up the specifications, we had opted for a steel structure. Everything had been calculated on that basis by the engineering consultancies DELTA GC (structural engineering) and A+ CONCEPT (building services). But the successive COVID and energy crises, as well as the conflict in Ukraine, took their toll, sending the price of materials, including steel, soaring.” Faced with this unforeseen situation, Duchêne looked for and found a solution by switching from a steel structure to one made of glued laminated timber.

Grégory Hogge, site technician at Duchêne, confirms: “Beyond the financial issue, the question arose just as the company was starting to develop a timber construction unit, prompted by our low-carbon approach. This building for SPI is probably one of the first industrial buildings Duchêne has built using a timber frame.”

With 52 m3 of timber, the building delivers significant CO2 savings!

A versatile building

Although the future tenants’ activities are not yet known, the designers aimed to create spaces that would be as versatile as possible: three units, each combining around 200 square metres of workshop space and 50 square metres of office space, with the dual-pitched roof providing additional storage above.

One consequence of the change in structural material is that the prefabricated concrete sandwich panels are fixed to a timber frame using machined steel connections. From the outside, the three entrance areas are marked by timber cladding. The roof is made of metal sandwich panels, ensuring a very fast installation.

From the outside, the three entrance areas are marked by timber cladding.

Tight deadlines

Duchêne was awarded the contract in February 2022 (Lot 1: structural works and finishes), but work did not actually get under way until just before the summer construction industry holiday. Everything had to be recalculated to accommodate the new construction method, and the client had to be convinced that the change was the right one. Once approval was secured, the team had to step up the pace… Grégory Hogge: “We wanted all the concrete work completed before the Christmas break, but bad weather meant we could only finish two of the three units. We tightened the schedule a little and brought in more people for the masonry work, for example, so that the building services (electrical, HVAC and plumbing) could start as soon as possible.” Duchêne carried out the concrete work, masonry, internal joinery, cladding and finishing with its own workforce. Earthworks, drainage, roofing, external joinery and the timber structure were subcontracted. Site supervision was jointly handled by Julien Hazée and Grégory Hogge. For Grégory, it was a real first. The site manager was Julien Hourlay.

The works are due to be completed by the end of April. Duchêne demonstrated its ability to adapt, both technically and in terms of scheduling, to deliver an unusual business unit that will be a pleasant place to work. And the icing on the cake: with 52 m3 of timber, the building delivers significant CO2 savings!  

Question about this story? Ask your question

Who worked on it

  1. ClientSPI
  2. ArchitectAural
  3. Main contractorDuchêne (Groupe Eiffage)

Keep following this

Get an email when a new story is published. No account needed.

What you follow
  • SubjectProjects
Share this article

Follow on Construire la Wallonie

Follow

Follow a project or company and you’ll receive an email whenever a new story appears. Follow a theme or topic and you’ll receive a weekly roundup. No account or password needed: every email includes a link to what you follow.