Projects

A concrete Tetris to optimise on-site installation

Les façades en béton architectonique frappent par leur canevas répétitif, rythmé par une infinité de baies identiques.
Les façades en béton architectonique frappent par leur canevas répétitif, rythmé par une infinité de baies identiques.

The architectural concrete façades of the new INFRABEL building in Charleroi stand out for their repetitive pattern, punctuated by countless identical openings. The precast concrete elements were designed, manufactured and delivered by Mouscron-based company DECOMO. The challenge was to find the right format to optimise both production and on-site installation. Bruno Louage, head of DECOMO’s design office, explains the project’s constraints and challenges.

The original design called for columns between the openings and horizontal spandrel panels 1.50 metres high. This would have resulted in a huge number of elements to manufacture, handle and install on site. Bruno Louage says: “We therefore looked at how to combine the elements and rationalise the whole process. The standard element became a spandrel panel with 4 legs, measuring around 4.10 m long and 4.30 m high. Reducing the number of elements to install in this way saved a great deal of time on site.” This approach also has other advantages, for example in terms of dimensional tolerances. The distance between the centres of two columns is always exactly the same, since each element comes out of the same mould. “Even so, we still have 130 different production drawings. Sometimes the only difference is a small detail, such as a sleeve or an overflow.”

The standard element is a spandrel panel with 4 legs, around 4.10 m long and 4.30 m high.

Abnormal loads

The elements for this building are exceptionally tall because the storey height of 4.30 m is greater than usual, due to the extensive services in the raised floors and suspended ceilings. “This makes transport a little more complicated because the loads are oversized. We had around 200 elements of this size to transport, positioned in the direction in which they would be installed so that the installer, specialist contractor Straming, based in the Liège region, only had to hoist each 4-tonne element into place.”

Anthracite concrete 

Since true black cannot be achieved in concrete, the client opted for the darkest shade possible. An acid treatment gives the concrete a slightly rough finish. Bruno Louage says: “The building contains a total of 3100 m² of architectural concrete, corresponding to 4500 m² of finished surfaces. This represents between 120 and 150 days of production. Every project is a new challenge for DECOMO.”

Question about this story? Ask your question

Keep following this

Get an email when a new story is published. No account needed.

What you follow
  • ThemeNew ways of building
  • SubjectProjects
Share this article

Follow on Construire la Wallonie

Follow

Follow a project or company and you’ll receive an email whenever a new story appears. Follow a theme or topic and you’ll receive a weekly roundup. No account or password needed: every email includes a link to what you follow.