A catalogue of precast concrete elements

The 9th FEBE Elements Awards ceremony will take place on 25 November in the new lecture hall complex on the ULB’s Erasme campus in Anderlecht, which houses the Faculties of Medicine and Motor Sciences and the School of Public Health. The building showcases all the advantages of construction using precast concrete elements.
Built in 2019, the complex comprises four lecture halls and a monumental entrance hall. The ground floor houses the two smallest lecture halls, with 146 and 148 seats, and a larger one with 329 seats. Together, the rooms fill a quarter-circle with a radius of 35 metres. A fourth lecture hall extends above the ground floor and can accommodate up to 772 students. For planning reasons, speed and efficiency, the client chose to use as many precast concrete elements as possible. The result is a veritable catalogue of precast concrete elements: columns, beams, prestressed floor slabs, grandstand elements, stairs, landings, hollow-core walls, solid walls, and curved beams and walls.

There are other reasons why this building merits closer attention. To begin with, connections between curved walls and the many irregular components were far from commonplace. In addition, some elements were too large to be delivered as precast units, while connecting the cast in situ and precast elements presented a further challenge.
As the various elements were supplied by companies within the CRH group, the client chose to entrust project management to d-Concrete!, which provides integrated solutions across the CRH group through coordination, engineering and project management.
David Dupont of dConcrete! explains: «In this project, the precast elements are more complex and technical than those typically found on traditional construction sites. Each lecture hall spans two floors. Beneath the rows of seats are the complex walls and beams that support them, all surrounded by perimeter columns, including the large column that runs the full height of the building. It was therefore sometimes very difficult to understand the situation from the plans and 2D views. To manage the interaction between the cast in situ and precast work as effectively as possible, we redrew everything in 3D. Many elements had large stair-like forms resting simultaneously on a cast in situ column and on a double wall and/or precast beams with the necessary cut-outs. This is precisely the kind of project where BIM is very useful. The result was a 0% error rate.»

Needless to say, FEBE, the partners behind the nominated projects and the participants in the FEBE Elements Awards are already looking forward to seeing the building for themselves. (www.febeawards.be)
This article also appeared in BETON 253, published by the Federation of the Concrete Industry.
Université Libre de Bruxelles, Campus Erasme: Faculty of Medicine lecture halls 2019, Brussels
Technical details
Client
Université Libre de Bruxelles
Architect
ArtBuild Architects
Contractor
Valens
Engineering consultant
Pirnay
Precast concrete elements
CRH Structural Concrete Belgium