Safety and comfort, from basement to ceiling
Texte Florian Holsbeek | Photos Sotrelco

The quality of a project is about more than its design and functionality. A self-sufficient, secure building offers undeniable added value, particularly in light of current concerns.
Sotrelco is a family-run business based in Strepy-Bracquegnies, with more than 40 years’ experience in building services engineering. Michaël Mansart is an account manager for the electrical division and followed the « Science 12 » project closely, from the tender stage through to handover. « We work extensively with Democo, one of our regular partners. Together with Democo and the engineering consultancy Crea-tec, we developed and proposed solutions that enabled them to submit a comprehensive offer meeting the tender specifications, both in terms of aesthetics, in collaboration with the architects, and technical requirements, in collaboration with the engineering consultancy. One distinctive feature of the project was the coexistence of a green roof and a photovoltaic panel installation. »
« We incorporated LED strips into the chilled ceilings and highlighted the building with lighting on the terraces. The project was completed early in 2023, but I had been working on it for more than two years », says Michaël Mansart.

Flexible letting
Sotrelco also worked on an element that was important to the developer: access control. « The client wanted flexibility in how the building could be organised and subdivided, from one floor to another and across each floorplate. The integration involved three elements: access control (DORMAKABA), lift management (KONE) and COMYDO readers. A distinctive feature of these readers is that they can operate using QR codes, removing the need for a physical access card. For this reason, Sotrelco proposed using the KNX protocol to manage the lighting, as well as integrating the access control system with the lifts. »
One distinctive feature of this project is that the building has a car lift. « The car park is on two levels, so there is a lift for cars, which is not common in Brussels. We had to pay particular attention to the RF standards. These cover fire safety requirements and the additional requirements of the SIAMU. We installed 5 dual charging points for electric cars. A generator ensures that the lift can operate, as well as other components of the safety system, such as the smoke extraction units and the sprinkler system », concludes Michaël Mansart.
From basement to roof, everything has been put in place to ensure the comfort and safety of users of the new « Science 12 » building.