Exemplary execution of a demanding transformation
Texte Joaquim Dupont | Photos Gillion Construct

The city of Liège is currently undergoing intensive urban redevelopment alongside the tram project. As part of this monumental project, numerous public buildings are being renovated, starting with the Cité Administrative tower in the city centre. Funded by the ERDF, the renovation will turn the ageing tower into a true benchmark for performance, making it a “zero-carbon” building on completion. The general contractor Gillion Construct, working in a temporary joint venture with Louis De Waele, were appointed as general contractors for this design & build project and demonstrated exemplary flexibility during the works, meeting the client’s requirements and delivering an impeccable end result.

Unfailing flexibility
“We had to adapt constantly, particularly in response to the many changes to the plans as the project progressed. We would normally draw up schedules for the full duration of the works. For the Cité Administrative project, we had to reorganise them week by week, knowing they could be changed again at any time,” sums up Ludovic Trolle, site manager for Gillion Construct.
Given the demanding and changeable programme, phasing proved difficult to manage, with work taking place on 18 floors at the same time: “We were still carrying out structural work in some areas while others were already at the finishing stage. Sometimes, we were even at different stages of progress on the same floor,” he adds.
The project’s circumstances also called for flexibility, as the works took place during the Covid period and the Russian-Ukrainian conflict. These events caused significant disruption compared with a standard construction project. Delivery delays, changes to the materials originally specified and general price rises all had a major impact. Despite these difficulties, the deadlines were met, demonstrating the contractor’s flexibility and ability to adapt, even in the most extreme circumstances.

A benchmark building
The new Cité Administrative can claim to be a “zero-carbon” building, thanks in particular to high-performance insulation of the building envelope, the installation of photovoltaic panels, an intelligent lighting system and the implementation of a geothermal heating system comprising 4 wells, each 15 metres deep, drilled into the gravel of the Meuse riverbed. The building is also designed to be user-friendly and 100% accessible to people with reduced mobility, ensuring optimal working conditions and visitor comfort.
Challenges overcome with distinction
The teams faced other challenges on the Cité Administrative project. The most thorny issue was undoubtedly managing what Johann Bombaerts of Gillion Construct dubbed the “infernal triangle”: compliance with fire safety, acoustic and structural standards, requirements and restrictions. “As soon as we found a solution for one category, it failed to meet the requirements of the other two. We spent hours looking for solutions that would work for all three at once.”
The general contractor also had to contend with challenges posed by the building itself. A symbol of modernist architecture from the 1960s and 1970s, it was not particularly suited to the renovation objectives: “For example, there was very little ceiling void space available for installing all the necessary building services,” adds Johann Bombaerts.
A suspended loggia
The loggia built on the 1st floor also deserves a special mention. The design team opted to suspend it in response to a particularly unusual situation: “A conventional structure with columns and concrete slabs would have required solid foundations in the basement. Unfortunately, the basement at this level was already occupied by a car park belonging to a neighbour who did not want its area reduced. We therefore had to think differently, and opted for a suspended loggia with a steel structure and timber frame. This called for extensive and complex structural studies, but the effort paid off. It is a real success, both aesthetically and architecturally,” he concludes.

Question about this story? Ask your question
Who worked on it
- ClientVille de Liège
- ArchitectAssociation momentanée Baumans-Deffet: Canevas
- General contractorAssociation momentanée Gillion Construct: Louis De Waele
Keep following this
Get an email when a new story is published. No account needed.
- ThemeRenovating existing buildings
- SubjectConstruction