Texte Philippe Selke Photos Arno Louwagie

Des pompes à chaleur de grande puissance témoignent de l’importance des techniques spéciales dans le projet Edenya.
Des pompes à chaleur de grande puissance témoignent de l’importance des techniques spéciales dans le projet Edenya.

Since 2018, TPF Engineering has been contributing to a development Masterplan for Pairi Daiza, including upgrades to the site’s energy and water networks, a new entrance, accommodation, technical advice on the 40 MWp photovoltaic carport, … culminating in Edenya, the world’s largest tropical greenhouse, covering 4 ha. The internationally renowned Belgian engineering consultancy was responsible for the structural design and building services engineering of this one-of-a-kind project.

Around twenty plant rooms, 14 water filtration systems, 1400 m3 of rainwater storage, 55 km of pipework, 15 000 m2 of ventilation ductwork, 880 000 m3 of air recycled and purified by 39 air handling units, numerous heat pumps of different types and capacities, … these key figures alone demonstrate the scale of the task. But the challenges tackled by TPF Engineering and its installation partners went beyond sheer quantity. Serge D’hayer, engineer and project manager at TPF Engineering: “With no precedents to draw on, this project meant venturing into the unknown, both technically and economically. It changed considerably from the first pencil stroke onwards, demanding an unprecedented capacity to adapt.”

An overall strategy

As well as the construction cost of the greenhouse, its size and the volume of its pools shaped the costs of running it: large plant rooms housing the technical installations, systems designed to manage energy consumption sustainably (air conditioning, ventilation, filtration, …), a geothermal project still under way, … To give just one example, a water-to-water heat pump can provide heating for the greenhouse and cooling for the hotel and restaurant at the same time. To ensure the planned performance levels and provide optimum monitoring of the various installations, a comprehensive building management system and more than 150 energy meters have been installed.

“The park combines the characteristics and regulatory requirements (fire safety) of a zoo, a hospitality venue and a leisure park.” (photo: Pairi Daiza)
TPF Engineering was responsible for the structural design and building services engineering of this one-of-a-kind project.
Specific lighting scenarios, an appropriate sound level, fire protection systems, … nothing is superfluous, and everything had to be designed with nature’s untameable character in mind.

Animals and people

The next challenge for TPF Engineering was to adapt to the 6 biotopes represented in the greenhouse, each a project within the project. Indoor and outdoor habitats for the animals, hotel rooms and restaurants for visitors: everything is designed to ensure the comfort of both. Specific lighting scenarios, an appropriate sound level, fire protection systems, … nothing is superfluous, and everything had to be designed with nature’s untameable character in mind. Serge D’hayer: “The park does indeed combine the characteristics and regulatory requirements (fire safety) of a zoo, a hospitality venue and a leisure park.”

A different world

Serge D’hayer concludes by reflecting on the unique experience he had during his 8 years working on Pairi Daiza: “On a project like this, nothing works the way we are used to. We were constantly breaking new ground. Craftsmanship went hand in hand with industry, the imaginative with the practical. By its very nature, nature is chaotic and imposed its own rules, constantly changing the scenery and, consequently, the way the construction site was managed. From the main MV switchboard to the room controller’s programme for dimming the lights so guests could enjoy the view without disturbing the animals, to give just one example from my field of expertise, our remit was exceptionally broad. We always made sure the technology served the beauty of the place, carefully concealing it from visitors. I can therefore say that TPF Engineering acclimatised perfectly to the atmosphere of the site.” 

Filtering the water in the large pools was a major challenge.

Question about this story? Ask your question

Keep following this

Get an email when a new story is published. No account needed.

What you follow
  • SubjectConstruction
Share this article

Advertisement

Follow on Construire la Wallonie

Follow

Follow a project or company and you’ll receive an email whenever a new story appears. Follow a theme or topic and you’ll receive a weekly roundup. No account or password needed: every email includes a link to what you follow.