Construction

De Boterton, a residential project with more than 500 aluminium windows

De Boterton à Lierre est un projet résidentiel comprenant 72 appartements répartis en cinq blocs distincts.
De Boterton à Lierre est un projet résidentiel comprenant 72 appartements répartis en cinq blocs distincts.

For De Boterton, a brand-new residential complex comprising 72 apartments on the banks of the Nete in Lier, main contractor DCA called on Aliplast Aluminium Systems of Lokeren. Thanks to its vertical integration, the company has been developing and manufacturing aluminium systems for external joinery for more than 35 years, extruding, powder-coating and thermally insulating the aluminium profiles itself. Its partner Peter Moeskops bvba, which handled the manufacture and installation of the window units, also carries out 100% of its work in-house, just like Aliplast. Jourik Duwez, Sales Director at Aliplast, and Jelle Moeskops, who is responsible for day-to-day management at Peter Moeskops, explain how this residential project was delivered.

A large proportion of the windows had to be installed before the façade was even in place.

Durable, for outstanding longevity

“For us, Boterton is a textbook example of the kind of project we like to deliver. We manufactured a large number of identical windows, in the same colour and with the same profile depths. Our STAR75 system, an aluminium window system with enhanced security that combines sleek design with excellent thermal insulation for low-energy homes, meets current energy requirements and complies with all acoustic standards. Naturally, we kept a close eye on the schedule so that our client Peter Moeskops could manufacture and install the window units on time. The icing on the cake? Our STAR75 system has received cradle-to-cradle certification, the ultimate confirmation for us that our sustainability initiatives are valued by both our B2B customers and the end users of our products. Because we produce everything ourselves and do not depend on suppliers, our client was able to manufacture five hundred aluminium windows and doors of four different types for the five Boterton blocks in less than a month,” explains Jourik Duwez.

“The fact that our STAR75 system has received cradle-to-cradle certification is the ultimate confirmation for us that our sustainability initiatives are valued,” says a delighted Jourik Duwez.

Proactive installation

Jelle Moeskops adds: “A large proportion of the windows had to be installed before the façade was even in place. We aligned the brackets correctly, then installed the windows on them and started attaching the EPDM seals, rubber strips that provide a durable seal around the windows. This meant that interior finishing work could begin while the bricklayers were still working outside. Of course, it is much easier to work once the external envelope is in place: you simply install the windows against it, so to speak. We still managed to do it thanks to a carefully considered action plan. Another advantage is that Boterton consists of five separate residential blocks, which allowed us to progress in line with the construction of each individual unit.”      

Een zakelijke vraag aan Aliplast Aluminium Systems? Get in touch

Who worked on it

  1. ClientSM De Boterton (Lierre)
  2. ArchitectDe Architecten nv (Lierre)
  3. Main contractorDCA nv (Beerse)
  4. Also involvedAliplast Aluminium Systems

Keep following this

Get an email when a new story is published. No account needed.

What you follow
  • ThemeFaçades and building comfort
  • SubjectConstruction
  • CompanyAliplast Aluminium Systems
Share this article

Follow on Construire la Wallonie

Follow

Follow a project or company and you’ll receive an email whenever a new story appears. Follow a theme or topic and you’ll receive a weekly roundup. No account or password needed: every email includes a link to what you follow.