Last September, nearly 500 pupils started the school year at a completely renovated municipal school in Ans. It took nearly a year to transform this building, constructed in the late 1970s, into a facility that meets current energy standards. Vincent De Groote, Building Manager at Duchêne, takes us behind the scenes of this renovation.

The tender for the energy retrofit of the municipal school in Alleur was published in March 2021. Duchêne Group submitted a bid and was selected. “We then met the client, the municipality of Ans, and the architect, Benoît Voneche,” Vincent De Groote tells us. His partners on the project were Dimitri Soudron (site manager) and Rudy Gillis (joinery project manager). “This was an energy retrofit. We had to redo the external envelope of this period concrete building, which was not particularly well insulated.”

“We had to install ventilation to ensure air could circulate in these rooms, which are mostly enclosed and are now well insulated.”

Cladding that is as colourful as it is effective

Vincent De Groote explains the scope and details of the project: “First, there was a great deal of work to do on the façades. They were not demolished, but we completely insulated them. Fibre-cement cladding was installed, adding a splash of colour. This is a real aesthetic improvement for the building: the façade is much more than an insulating envelope that reduces energy costs.”

But that was not all: “The client also asked us to replace the window frames. All the classroom windows were therefore replaced, as were the entrance doors. We also upgraded the stairwells to meet fire-resistance standards. Finally, we were asked to install new suspended ceilings throughout the building, as we had to incorporate supply and extract air ducts for air renewal,” Vincent De Groote stresses.

“The entire building was upgraded to meet fire-resistance standards.”

Air renewal also became essential as a result of the energy retrofit. “With the new energy-efficient cladding and the new window frames, the envelope became airtight. As the rooms are heated, it creates a giant thermos. We therefore had to install ventilation to ensure air could circulate in these rooms, which are mostly enclosed and are now well insulated.”

“We suggested installing new, more energy-efficient lighting.”

A contract that evolved

Up to this point, Vincent De Groote and his colleagues had stayed within the scope of the original contract. But, ever the perfectionists, they proposed a more comprehensive renovation: “Following our findings, the scope of the contract evolved. The entire building was upgraded to meet fire-resistance standards. We then suggested installing new, more energy-efficient lighting. It would have been a shame to install a new suspended ceiling and then put the old lighting back in. Finally, we were also asked to refresh the building and repaint it.”

Despite the changes to the contract, the project was completed on time. “We had to finish by 29 August, as the municipality had committed to that date for a very specific reason: the rooms had been vacated for the duration of the works, and the aim was to complete the reorganisation before the start of the school year, not during it. That was our goal. We had committed to meeting the deadline and we kept our word, despite the challenges posed by COVID and the shortage of materials. But a project without problems wouldn’t be a project,” Vincent De Groote jokes.

“We delivered a complete project that was positively received by the entire teaching staff.”

Pupils and teachers can now enjoy superb facilities in a colourful building that brings life to the playground and, to top it all, uses far less energy. “We delivered a complete project that was positively received by the entire teaching staff. Working conditions are excellent, including for the pupils,” concludes Vincent De Groote.  

Question about this story? Ask your question

Who worked on it

  1. ClientCommune de Ans
  2. ArchitectBenoît Vonèche
  3. Main contractorDuchêne

Keep following this

Get an email when a new story is published. No account needed.

What you follow
  • ThemeRenovating existing buildings
  • SubjectConstruction
Share this article

Advertisement

Follow on Construire la Wallonie

Follow

Follow a project or company and you’ll receive an email whenever a new story appears. Follow a theme or topic and you’ll receive a weekly roundup. No account or password needed: every email includes a link to what you follow.