126 student rooms in former Belgacom building in the heart of Liège

Known to the people of Liège as the “Belgacom” building, after the company that occupied it for many years, the large building on rue de l’Université in central Liège has undergone a complete change of use, led by property company Zabra Real Estate S.A. The upper floors now offer 126 modern student rooms for rent, with a shared recreation area and a kitchen on each floor, as well as two bicycle parking areas. The lower floors will be occupied by medical practices.

Architecturally, the building’s appearance, dating from its construction in 1952, has been preserved and the blue limestone façades have been refreshed. Contractor Duchêne was commissioned to carry out the finishing works and manage the programme for two other packages: electrical work and heating and ventilation systems. “The building was stripped back, with the offices, suspended ceilings and floors dismantled. Only the external envelope was retained,” explains Alexandre Lepot, site manager at Duchêne. “We then installed all the partitions, integrated the numerous building services, laid the screed and installed new floor finishes, suspended ceilings and paintwork. We worked on site from mid-October 2021 to June 2022. The schedule was tight, but we did not encounter any major problems.”

“LEAN” programme management
The student rooms had to be ready for the start of the academic year in September 2022 and available to rent from June, so Duchêne had to meet a strict schedule. To do so, it used the “LEAN” planning method, which is being progressively introduced across all Duchêne sites. “The building was divided into zones, with coloured sticky notes, one colour for each company, displayed on a board. This made it possible to monitor the schedule daily rather than weekly, as is generally the case. Despite the deadline, we were relatively comfortable,” the site manager continues.
The company was responsible for building the 126 student rooms on floors +1 to +4. Duchêne’s Joinery department was particularly busy, as wood features prominently in every room: mezzanines, balustrades, doors, desks, curtain pelmets, shelves above the fridges, bathroom furniture and more. All these wooden elements were made and installed by Duchêne Joinery, which also built the large shared kitchens on each floor in laminated wood.

High acoustic performance requirements
Another important requirement set by the client’s architect was the acoustic performance of the student rooms. “The required sound insulation called for substantial partitions: five plasterboard layers and two insulated frames between each room and between each room and the corridor, with a cavity between the profiles and rock wool insulation. This involved thousands of plasterboard sheets, and the volume of materials used is impressive! The result is quite satisfactory.” “

On floor +4, the contractor also built the small terraces, replaced the window frames, renovated the roofs and installed new waterproofing to the terraces. Duchêne laid the floor finishes on every level: vinyl in the student rooms, and tiles and wall tiles in the kitchens and bathrooms. It also installed the shower screens and appliances.
As we go to press, three floors have been handed over, and the fourth is due to be ready by the end of June. Once again, Duchêne managed the project and met demanding deadlines!
Question about this story? Ask your question
Who worked on it
- ClientZabra Real Estate
- ArchitectBAG
- Main contractorDuchêne (Groupe Eiffage)
Keep following this