A concrete collaboration that overcame the constraints
Texte Philippe Selke Photos Ets E. Ronveaux

Alongside its existing buildings in Transinne, Pierret Portes & Fenêtres is building a new 28 000 m2 factory, with the aim of doubling its production of PVC windows and frames. Working for the temporary association Thomas & Piron Bâtiment - Galère Lux, Ets E. Ronveaux was responsible for the design, production and erection of the concrete structure, which comprises an impressive number of precast elements: 349 columns, 629 beams and 3600 m2 of hollow-core slabs. Magali Peron, business engineer at Ronveaux, lifts the lid on the features of this project, completed at a brisk pace.
Comprising a modern production and dispatch hall, canopies and offices, the new factory takes the form of a large-scale industrial building, measuring around 280 m long by 100 m wide. This is no daunting prospect for Magali Peron and her colleagues, who are well versed in this type of project. The temporary association between Thomas & Piron Bâtiment and Galère Lux entrusted them with the construction of the structure, made entirely from precast concrete elements, most of them prestressed.

Including erection
Magali Peron: “As well as the design and manufacture, we also carried out the full erection, as we generally do on our French projects. This is less common in Belgium, but we offer it when the main contractor lacks the teams or the time to do the work. We completed the project in 7 months, including design, drafting, production and erection. The hall had to be ready to accommodate production machinery from April onwards. The project was subject to a tight schedule, and the slightest unforeseen issue could have put progress at risk. Our experience with this type of work, combined with our proximity to the site, less than half an hour away, enabled us to meet the challenge efficiently.”
Constraints and prestressing
The design office had calculated the foundations but had not been able to draw up the concrete structure itself, so Ronveaux developed the design directly from the architectural plans. By adapting them wherever the practicalities of construction required, the team created a new and fruitful collaboration between the architect, contractor, design office and Ronveaux teams. Magali Peron: “To give one example, in the drive to make the best use of space, a column had to be removed to make room for a production unit that required considerably more floor space. This constraint led to the creation of two new, non-standard prestressed beams, each weighing 50 tonnes and spanning 31 m, placed side by side…”
All the hollow-core slabs were also prestressed and produced at the Ronveaux factory in Crisnée. Some were equally unusual in size, measuring 50 cm thick and 17,7 m long, for a pedestrian walkway.
To make the best possible use of the site, the architect designed some of the façades at an angle, making the beam connections somewhat more complicated. The trapezoidal columns were another unusual feature.

Design-stage collaboration
For Magali Peron, who has been a business engineer for almost 5 years, this project was certainly the most intensive, even if it was not the largest in terms of volume, because of the tight deadline: “The project lasted 7 months, and I spent 5 of them working on it exclusively. It was also clearly the project that involved the most interaction with the different stakeholders. Developing the structural design in coordination with the design office allowed us to get involved much earlier than usual, and consequently to influence the design. This benefits everyone, as it means we can propose solutions at a very early stage, given the precast nature of the structural elements. The good working relationship with the staff at Thomas & Piron - Galère Lux also greatly contributed to the success of our work, including the erection of the elements.”
Project details
Client Pierret Portes & Fenêtres
Architect Tréma Architecture
Design office Betec
Main contractor Thomas & Piron Bâtiment - Galère Lux
Question about this story? Ask your question
Keep following this
Get an email when a new story is published. No account needed.
- ThemeFaçades and building comfort