- Construire la Wallonie
- All articles
All articles
3,506 stories on Construire la Wallonie, newest first.

Exceptional mobilisation for an extraordinary double project
From 24 September to 17 October last year, the Meuse was closed to navigation along almost 45 km between the French border and the La Plante barrage in Namur.
News
Our passionate teams are by your side
News
Silence, we’re racing!
Construction
Challenge met for the grandstand at a legendary corner
News
Four engineers riding the Raidillon wave
Construction
Meticulous prefabrication
Construction
An excavator for underwater work
News
Hide these techniques from my sight
Construction
The new jewel of the “Toboggan of the Ardennes”
Construction
A watertight, crack-free compression slab for the Scheldt Bridge in Temse
Infrastructure
Nooteboom strengthens its service network in Belgium with Antwerp Truck & Trailer Services
News
13 new classrooms and a sports hall for Athénée Royal Les Marlaires
Construction
The MAN TGS turns heads on every construction site
Equipment and machinery
Un pont haubané de haut vol pour les bus namurois
Projects
Multimodality arrives at the station in Wallonia’s capital
Projects
When a crusher bucket becomes a primary crusher in the quarry
News
How TVH test benches are paving the way for sustainability
Equipment and machinery
Topolaser offers a (r)evolution in construction with hilab & AP20
News
Strengthening sustainability
Construction
The multi-technology integrator equipping roads and tunnels
Infrastructure
Living in the Bavière Triangle
Construction
Rail projects in Tubize and Visé built on flexibility and quality
Infrastructure
Une vision durable qui fait carrière
News
All systems go for screw piles
ConstructionThe best of Construire la Wallonie in your inbox every two weeks.
- Projects, products, solutions and partners
- The most interesting industry developments
- Free and without further obligation
Sign up for free
In your inbox every fortnight.










