Dozens of workers are currently busy along Route du Condroz in Liège, building the infrastructure needed to launch the first Bus Rapid Transit line, or Busway, which will soon link Guillemins station with Sart Tilman. The contract was awarded to Nelles, working with TRBA for the first time, in what is likely to be a precursor to many more projects of this kind. Dedicated bus lanes, junctions with traffic lights that give buses priority, new bus stops and cycle lanes will make journeys quicker and safer, giving mobility in Liège a major boost.
On this project, which stretches for several kilometres, Nelles is handling utility services, demolition, foundations and preparatory work for the road surfacing, while TRBA is responsible for the concrete and asphalt surfacing and in-situ cast linear elements. Thomas Bastin is a site manager at Nelles. He explains the difficulties encountered and challenges overcome on a project originally scheduled to take 300 calendar days.

“The original contract only called for the road structure to be replaced in specific areas, but partway through the project, OTW ultimately asked us to rebuild it in its entirety. We are therefore removing the tarmac and then the foundation before building a completely new road structure across the full width of the widened carriageway.”
The contract also involved altering 120 inspection chambers, which had to be either relocated to accommodate the wider road or modified. This is laborious work, as you never know in advance what you will find. Every case is different. To save time, Nelles prefabricated on site everything that could be.

Nelles was also responsible for installing utility services along an 800-metre section: water pipes, high- and low-voltage cables, Proximus and VOO cables, and more. Thomas Bastin explains: “With so many access points for residents, we faced a host of constraints and had to find solutions quickly. We also had to ensure residents could always access their homes, crossing the cycle lane under construction. Most importantly, as stipulated in the project specifications, we had to maintain two-way traffic at all times to keep traffic flowing along Route du Condroz, the main access road to the CHU and ULiège sites and the Parc Scientifique.”

Given the many constraints and tasks, Nelles’s flexibility is a major asset. Drainage, minor civil engineering works, demolition and utility installation are among the specialisms of the company based in Xhoffraix (Malmedy). If a problem arose with a utility service, a Nelles team was on hand to fix it quickly.
To provide residents with the best possible support, the contractors and OTW improved their communication by setting up a dedicated 0800 number for reporting any problems.
At the same time as the work on Route du Condroz, two Nelles teams are upgrading the bus stops at the university site in Sart Tilman. They are demolishing the existing platforms and rebuilding them to match the Tram stops, with higher white-granite kerbs. The aim is to make the link between Bus Rapid Transit and the Tram clear at a glance…
Een zakelijke vraag aan NELLES frères SA? Get in touch
Companies in this story
Keep following this
Get an email when a new story is published. No account needed.
- ThemeTransforming infrastructure and territories
- SubjectUnderground infrastructure and sewerage
- CompanyNELLES frères SA