Underground infrastructure and sewerage
A flow measurement chamber for the Coo hydroelectric power station

Work is currently under way at ENGIE’s hydroelectric power station in Coo to increase its storage capacity and output. The Coo pumped-storage power station is an essential complement to intermittent renewable energy sources. It stores energy in the upper reservoirs when there is a surplus of production, then releases it later when demand exceeds output. As part of the project, a STRADAL inspection chamber was recently installed by contractor Eloy, with technical support from Riopro and logistical coordination by Superplastic.
The chamber, which incorporates a Venturi channel and takes the form of a rectangular concrete structure measuring 3 x 1.3 x 2.65 m externally, allows patrol staff to take regular on-site flow measurements at the outlet of the existing drainage tunnel. Fitted with lifting anchors, the chamber weighs nearly 10 tonnes. One of the excavators Eloy was using for the earthworks lifted it into place on a stabilised base.

Ready to install, far from anywhere
In an era of universal connectivity, it is worth noting that the measurement system installed at Coo is entirely manual, with ENGIE staff taking readings on site. This is because the system is located «in the middle of nowhere», far from any electricity or telecoms network.
Wissam Zaafrane, export director at French manufacturer STRADAL: «This kind of product is not standard for us. On the contrary, it is made to measure for a specific project and delivered ready to install, complete with a ladder and safety hook.» With their operators’ safety very much in mind, ENGIE does not allow them to enter inspection chambers if oxygen levels are too low. To avoid wasting time opening the chamber and creating a draught for half an hour, ENGIE requested side openings to provide constant natural ventilation.
Xavier Cornet, internal sales representative at Superplastic: «We work regularly with STRADAL, a specialist in self-supporting concrete structures. This project clearly demonstrates Superplastic’s ability to work with companies that can produce virtually one-off components to meet the client’s requirements.»