Infrastructure

BENOR-certified protection for concrete pipes with an epoxy coating

Lithobeton a développé EPOLITH-Top, un revêtement époxy certifié BENOR.
Lithobeton a développé EPOLITH-Top, un revêtement époxy certifié BENOR.

The major advantages of concrete pipes for hydraulic and sewerage works are well known. They are made from natural materials, have excellent mechanical properties, are practical to use, are 100% recyclable and have amply demonstrated their durability over the years. However, concrete itself is not sufficiently resistant to biogenic sulphuric acids (BZA) in wastewater, even when SR cements are used. The lime fractions are attacked, potentially reducing the wall thickness.

Lithobeton has been addressing this problem for some time by developing EPOLITH-Top, a BENOR-certified epoxy coating that has since been used many times to protect concrete inspection chambers.

Investment in an advanced pipe production line

Tom Bulcke, managing director of Lithobeton, explains proudly: “Our team has been working hard to find solutions that also protect pipes from gases caused by aggressive wastewater. In collaboration with a specialist partner, an epoxy coating was developed that has passed all mechanical and chemical tests in accordance with the strictest requirements of European standards. As a result, this coating is BENOR-certified. Thanks to its strong adhesion, it can even be applied to damp concrete surfaces, for example in existing sewer systems.

The quality of the concrete pipe and epoxy coating is covered by the BENOR certificate, and the epoxy coating must be applied in a controlled environment.

In addition, investment has been made in an automated process for coating concrete pipes, with every effort made to ensure quality and finish. The quality of the concrete pipe and epoxy coating is covered by the BENOR certificate, and the epoxy coating must also be applied in a controlled environment. This fully automated production line ensures this through the use of robotic tools and operations, with integrated checks for, among other things, coating thickness and the complete sealing of the concrete. This gives customers confidence when using our coated pipes.”

A fully BENOR-certified concrete pipe

Lithobeton is targeting applications where the mechanical and chemical durability of pipes must be ensured, such as pipes downstream of a pumping station or other heavily loaded sections. Larger diameters, from 300 to 1000 mm, will initially be available. 

Lithobeton is therefore confident that this coated concrete pipe combines all the properties required for a durable sewer system and will consequently be included in specifications.   

Question about this story? Ask your question

Keep following this

Get an email when a new story is published. No account needed.

What you follow
  • ThemeManaging construction projects
  • SubjectInfrastructure
Share this article

Follow on Construire la Wallonie

Follow

Follow a project or company and you’ll receive an email whenever a new story appears. Follow a theme or topic and you’ll receive a weekly roundup. No account or password needed: every email includes a link to what you follow.