Optimising water resources at Tielt-Noord industrial estate
Texte & photos Lithobeton

The Blue Deal project ‘Flanders Waterproof’ is tackling drought and water scarcity. Thanks to a new approach that enables different sectors of industry to support one another, every drop of rain falling on Tielt-Noord industrial estate will soon have a useful destination. An integrated system that aims both to achieve independence from mains water and groundwater, and to optimise local infiltration and rainwater recovery.
Large volumes of water come from sites and buildings, whether industrial water or rainwater. As part of the Waterproof project, this water is stored in a central collector. When needed, it can be reused for and by industry.

General contractor Casteleyn is carrying out this exceptional project, which serves as a model for the future. Lithobeton’s specially designed infiltration channels and crates were once again used to allow rainwater to infiltrate into the soil. Some of the water is temporarily stored in the road sub-base or beneath the impermeable surface. From this initial retention stage, rainwater can gradually infiltrate into the subsoil, helping to maintain groundwater levels. In addition, some of this stored water can be collected in a recovery system located downhill and reused by businesses.
The days when rainwater was lost to the sewers are over. Every business park should be moving towards an integrated, sustainable water cycle in which rainwater can infiltrate into the subsoil or be reused through a buffering system.
Question about this story? Ask your question
Keep following this
Get an email when a new story is published. No account needed.
- SubjectPublic space


















