Thomas & Piron has just submitted its planning application for the redevelopment of the Dorcas site

The Dorcas eyesore will soon be a thing of the past
A year and a half after announcing its acquisition of the former Dorcas hospital site, Thomas & Piron Bâtiment has just submitted its single permit application. An ambitious project that will create a new neighbourhood with significant potential for the city.
Following the demolition of the former hospital buildings, now in a state of complete disrepair, the developer plans to build 5 buildings on the site, within a car-free, pedestrian- and cycle-friendly block, offering a choice of 3 living concepts:
“Living by the water”, for the buildings facing the banks of the Scheldt.
“Living at the gateway to the city”, for the residences along Chaussée d’Antoing.
“Living in a park”, for buyers who choose an apartment in the tree-lined heart of the block.
Carefully considered diversity will help integrate the project into its existing urban context and enhance the neighbourhood as a whole. The architectural vision is ambitious: buildings with a distinctly contemporary look and a strong identity will mark a new gateway to the city, both by land (the Devallée viaduct) and by water. They will respond to the dated silhouette of the Bastions silos, which face the project from the opposite bank. The stepped buildings will rise to ground floor + 8 storeys on the Scheldt side, where views are most open and the ground lies nearly 7m below the level of Chaussée d’Antoing and the Devallée viaduct.
One promise: every home, from the smallest (39m²) to the largest (131m²), will have a generous private outdoor space, in the form of a terrace, balcony, garden or loggia with sliding screens. The Covid-19 pandemic taught us how important it is to enjoy this kind of comfort at home.

A next-generation neighbourhood
This project is part of the “next-generation neighbourhoods” developed by Thomas & Piron Bâtiment. The developer identifies a site and takes a 360° view of its potential, assessing the quality of its location and its scope for active and public transport, sustainability and community life. The aim is to integrate the development optimally into the surrounding urban fabric and add value for local residents and the city as a whole.
At this scale, a new neighbourhood must also foster a sense of belonging. The roof terraces on 3 buildings will be fitted out for this purpose, providing space for activities such as community gardens, yoga or fitness classes, at residents’ discretion. A community space is also planned beside the towpath.
It could, for example, accommodate a flexible-use space. Last but not least, the project includes landscaped public spaces linked by a “sunken path” for pedestrians and cyclists between Chaussée d’Antoing and the RAVeL, providing a route to the city centre. The new public spaces will also offer two viewpoints over the Scheldt
Mobility: a bold move in keeping with the times
The project includes an underground car park with approximately 242 spaces, or just under one space per home. Every space will be equipped for electric vehicle charging. But it is in soft mobility that the developer is making a bold move: the project will include a network of bicycle storage facilities with a total capacity of approximately 437 bikes, or more than one per bedroom. Project manager Christophe Corduant explains the decision: « The project’s particular location at the gateway to the city, facing a RAVeL route, encourages us to rethink travel modes, with a focus primarily on soft and shared mobility. In this respect, the site is exceptional, thanks to the RAVeL route running along the Scheldt and past the project, which provides direct access to the city centre (and towards which we have oriented the bicycle storage facilities), as well as the nearby TEC bus stops, which provide access to the railway station, among other destinations. » And what about visitors? Cyclists and pedestrians are welcome: bicycle racks where they can secure their bikes are planned near every entrance to the residences. Everything is in place to encourage alternatives to travelling by private car.

Strategic economic and residential opportunities
The Dorcas redevelopment project forms part of a wider regeneration area known as “Quai 9”. The 9 stands for renewal, and also for the 9 strategic projects for Tournai that could be developed in the area, including those by Thomas & Piron Bâtiment and IDETA, which are currently jointly covered by a revision of the sector plan. IDETA recently acquired part of the ALC site (Ateliers Louis Carton) to develop an economic activity park (PAE) focused on the circular economy. Depending on the condition of the infrastructure, the former workshops will be converted to accommodate start-ups, a business centre on the banks of the Scheldt and serviced plots for micro and small businesses. IDETA is bringing economic activity to the area, while Thomas & Piron Bâtiment is leading the residential component. Together, they aim to create a new living neighbourhood capable of attracting new residents to Tournai.
This ambition meets the expectations of the local authorities. Paul-Olivier Delannois, Mayor of the City of Tournai: « This project proposed by Thomas & Piron Bâtiment is ambitious in both scale and its forward-looking philosophy. This major development is fully in line with the provisions of the municipal development plan and meets demand for quality housing in the city centre, while removing an eyesore that blighted the entrance to our city. I am delighted to see this whole neighbourhood undergoing such significant change, with numerous major projects taking shape, including the new police station, the justice centre and our intermunicipal agency’s new business park focused on the circular economy. The city has paid particular attention to the project’s architectural and environmental quality, as well as mobility within the development. »
If work proceeds as planned, the public inquiry should begin on 15/08/2022, and a permit could be granted by June 2023. Construction would then start in September 2023.
Project details
- Location: between Chaussée d’Antoing and the Scheldt, 7500 Tournai
- Programme: 250 new homes across 5 buildings, comprising studios and 1-, 2- and 3-bedroom homes.
- The project will include 4 adaptable homes and 12 homes reserved for AIS
- Approximately 242 car parking spaces and approximately 233 cellars
- Approximately 437 bicycle spaces (approximately one per bedroom)
- The ground floors of all buildings will have a dual use: residential or professional services.
- All homes will meet the Qzen standard.
- Construction expected to start in XX/2023
- Developer: Thomas & Piron Bâtiment
- Architects: DDS+ and A&G Atelier d’architecture
- Landscape architect: DR(EA)2M
- Builder: Thomas & Piron Bâtiment
- Illustrative CGI images by Asymétrie
Question about this story? Ask your question
Keep following this
Get an email when a new story is published. No account needed.
- ThemeRenovating existing buildings
- SubjectProjects


















