Projects

Tailor-made elegance for optimal drainage at Operaplein

En plus des avaloirs modifiés, ACO a fourni un système de drainage linéaire Multiline V150 avec grille passerelle en fonte.
En plus des avaloirs modifiés, ACO a fourni un système de drainage linéaire Multiline V150 avec grille passerelle en fonte.

The Opera pre-metro station opened in Antwerp a year ago. As part of the overall Noorderlijn project, BAM Contractors carried out the civil engineering, infrastructure and roadworks.

For drainage at the redeveloped Operaplein, the contractor called on ACO, a specialist in drainage systems and separation technology. “Getting the sizing right was crucial, and ACO’s proposal met our expectations,” says Stefaan Vanelderen, project manager at BAM Contractors.

The redevelopment of Operaplein is part of the overall Noorderlijn project. Led by transport operator De Lijn, the city of Antwerp and Vlaams Agentschap Wegen en Verkeer, the project aims to improve road safety for all users and ensure a high quality of urban life. BAM Contractors and the Tramcontractors Bouw joint venture (BAM Infra Rail, BAM Track and ENGIE) worked for more than four years on this major mobility and urban development project, killing two birds with one stone: improving traffic flow while helping to bring about a shift towards sustainable mobility solutions.

Multiline V100 was chosen to drain the tram boarding areas.

Limited construction depth

Operaplein is much more than a new car-free square. The existing Opera pre-metro station has been refurbished and expanded underground. Alongside the station, a car tunnel, an underground car park and a bicycle shelter will form a single architectural ensemble. BAM faced a limited construction depth when designing the drainage for Operaplein. Stefaan Vanelderen explains: “Because of the underground metro station and the tunnel running from Italiëlei to Frankrijklei, there was only 35 cm of depth available in some places. Conventional gully pots could not be installed, so we ultimately decided to use ACO HSD-2 bridge gullies. The grating had to fit perfectly with the natural stone paving pattern. The stone could not be cut, and the grating frame had to measure 40 x 60 cm. ACO therefore manufactured a custom cast-iron frame to fit around the standard HSD-2 grating.”

BAM Contractors called on ACO to drain the redeveloped Operaplein.

A bespoke solution

Bespoke work is nothing new for ACO, quite the opposite: “We always work with our client to find a solution, whether they are a design consultant, architect or contractor,” says Dries Aerts, Product Manager at ACO. “The plans called for point drainage, but it quickly became clear that our standard products would not be sufficient, as the gully had to be made to measure to suit the paving. After consulting internally, we proposed supplying a standard gully with a custom frame. BAM’s challenge was complex, but our strength lies in always trying to find a solution.”

As well as the modified gullies, ACO supplied 130 m of Multiline V150 linear drainage with cast-iron bridge grating. Multiline V100 was chosen to drain the tram boarding areas. ACO provided technical support throughout the process. “The installation went very smoothly, partly thanks to the excellent technical support from ACO’s contacts. The gullies were carefully installed, followed by the outlet pipes. The drainage was laid at the same time as the natural stone paving to ensure that it did not deviate, even by a few centimetres.”

ACO manufactured a custom cast-iron frame to fit around the standard HSD-2 grating.

Close collaboration

BAM is very satisfied with its collaboration with ACO. “During the preparation phase, we had to find a suitable solution that met the client’s requirements. We found it with ACO. Sizing was crucial, as the gullies had to fit perfectly between the natural stone slabs. Close cooperation between BAM and ACO was therefore extremely important, and it worked very well,” says Stefaan Vanelderen. ACO is also proud of the project. “The drainage fits perfectly into the overall design of the square. Its layout is very distinctive and calls for a solution that is both high-quality and visually appealing. And the result is impressive,” concludes Dries Aerts.   

Vraag over dit verhaal? Stel je vraag

Bedrijven in dit verhaal

Blijf dit volgen

Bij een nieuw verhaal krijg je een e-mail. Geen account nodig.

Wat je volgt
  • ThemaTransforming infrastructure and territories
  • OnderwerpProjects
  • BedrijfACO
Deel dit artikel

Volgen op Construire la Wallonie

Volg

Bij een project of bedrijf krijg je een e-mail zodra er een nieuw verhaal over verschijnt, bij een thema of onderwerp één keer per week een overzicht. Geen account en geen wachtwoord: in elke mail staat een link naar wat je volgt.