Cegelec specialises in consulting, design, engineering and the delivery of technical installations in commercial and industrial buildings. For the renovation of Westland Shopping Center, Cegelec brought its expertise to the refurbishment of the electrical installation, as well as the installation of new HVAC and plumbing systems. Jean-Marc Warichet, Business Unit Manager Elec South-West, and Jean Pierre D’Ambrosio, Business Unit Manager Plumbing South, spoke to us about their involvement in the project.

LED lighting was also installed in the new underground car park.

A coherent fire detection system

“We started by replacing the primary electrical circuit,” explains Jean-Marc Warichet. “We replaced the high-voltage substations one by one, along with the generator, installed UPS systems and, above all, replaced electrical switchboards that were more than 20 years old, all without disrupting the smooth running of the various shops. We also installed brand-new, more energy-efficient LED lighting.”

Particular attention was paid to the fire detection system: “We had to rationalise the system as a whole by centralising the fire detection units. In the shopping centre’s original design, each shop had its own fire alarm panel. Now, when a shop changes use, the new tenant connects to the main system. This greater coherence gives the site manager an overview of everything happening not only in Westland Shopping Center but also in the shops,” concludes Jean-Marc Warichet.

“The ductwork, which is usually ordered from abroad, comes from a company located less than 20 km from the site.”

A building designed to be as sustainable as possible

Jean-Pierre D’Ambrosio, Business Unit Manager Plumbing South, highlights the sustainable aspects of the project: “Above all, this is a BREEAM Excellent project with very high quality standards. We used sustainable, environmentally friendly solutions, including rainwater harvesting. We also prioritised local supply chains. For example, the ductwork comes from a company located less than 20 km from the site. Finally, geothermal energy, which powers the heat pumps and air conditioning, delivers substantial energy savings and helps make the building as sustainable as possible,” says Jean-Pierre D’Ambrosio.

He goes on to describe the work carried out by Cegelec. “We first had to remove the old ductwork, which was almost 30 years old. We installed three new, larger air handling units on the roof and replaced the air distribution network, adding new multi-directional diffusers for air purification and air conditioning throughout the premises. The addition of two new entrances to Westland Shopping Center meant installing warm air curtains. Finally, heat pumps were installed, along with two new cooling towers to air-condition both the gallery and the shops,” continues Jean-Pierre D’Ambrosio.

The primary electrical circuit was completely replaced.

Adapting to ensure customer comfort

None of this came without its challenges. “The biggest challenge was maintaining a constant temperature and good air quality throughout the site during the works, to keep visitors comfortable. We were able to adapt, and that is our strength,” concludes Jean-Pierre D’Ambrosio.

Question about this story? Ask your question

Keep following this

Get an email when a new story is published. No account needed.

What you follow
  • SubjectProjects
Share this article

Follow on Construire la Wallonie

Follow

Follow a project or company and you’ll receive an email whenever a new story appears. Follow a theme or topic and you’ll receive a weekly roundup. No account or password needed: every email includes a link to what you follow.