Projects

Supporting growth by building for itself

Texte Philippe Selke Photos Duchêne

Le nouveau volume comprend un rez en maçonnerie et panneaux sandwich et un étage en porte-à-faux en ossature bois avec bardage dans le même matériau.
Le nouveau volume comprend un rez en maçonnerie et panneaux sandwich et un étage en porte-à-faux en ossature bois avec bardage dans le même matériau.

With its joinery, established when the company was founded more than 90 years ago, Duchêne has become one of the leading players in the sector in Wallonia. Located at the Strée site, the workshop, which houses production facilities and storage space, has benefited from significant investment in recent years, doubling its floor area and keeping it at the cutting edge of technology. Now it is the offices’ turn to expand, with a brand-new building built, quite logically, by Duchêne’s own teams, featuring an interior that showcases the joinery’s expertise.

Until now, the joinery’s 12 employees have been based on a single office floor of around 150 m2. They are preparing to move into a new 270 m2 building over two floors. Tanguy Wolters, Liège Building Director and head of the joinery, explains: “After upgrading our facilities to keep pace with our growth, we found ourselves with outdated offices. Investing in a functional and pleasant workplace for our employees was the logical next step.” With the old offices demolished, the dozen employees have temporarily taken refuge in containers installed in the car park. Very soon, everyone will be able to work in a brand-new permanent building. It includes 12 workstations, plus two spare ones, as well as a canteen with a small kitchen and a large meeting room. Duchêne has also taken the opportunity afforded by this extension to completely refurbish the staff facilities for its site workers.

A project for itself

“As I write, the integration of the building services into the ceilings is nearing completion, while painting and floor-covering works are about to begin,” says Julien Hazée, site manager for this self-build project. Building for yourself is not an everyday occurrence. However, Duchêne planned and managed the project just like any other, with only the joinery’s own furniture programme being rescheduled slightly to make way for external orders.

The new building’s interior design is intended to showcase the joinery’s expertise: full-height doors on solid timber frames, timber cladding, and bespoke furniture in the communal areas, kitchen and offices. Tanguy Wolters says: “The Liège-based design studio Twodesigners worked on the interior layout to help inform our thinking. We had worked with them on EyeD Pharma/UniD Manufacturing at Sart-Tilman, one of the joinery’s finest references.” 

The building includes 12 workstations, plus two spare ones, a canteen with a small kitchen and a meeting room.

A “home-grown” project with a few constraints

On a sloping site, with a high-voltage substation on part of the ground floor supplying the entire site (including the extensive grounds of Sodemat, the company that manages Duchêne’s equipment),
a new building was constructed, with a masonry and sandwich-panel ground floor and a cantilevered timber-frame upper floor, built by a specialist sister company within the group and clad in the same material. The roof is also made of timber cassettes, reflecting Duchêne and Eiffage’s commitment to playing their part in a low-carbon future. An adjacent wood-chip silo was clad to integrate it more closely with the building. Julien Hazée explains: “As the joinery has a biomass boiler that makes use of all the wood chips and dust, the 250 m2 of offices benefit from underfloor heating connected to the boiler.”

The new building was therefore erected between one of the joinery’s halls and a road used heavily by Sodemat, creating a logistical challenge. Julien Hazée says: “Another major constraint was the high-voltage substation beneath the meeting room in the offices being built. Demolishing a building directly above an electrical substation in the middle of winter, which was exceptionally wet to boot, was no easy task. Water and electricity do not mix.” The 2.60 m cantilever of the upper floor required extensive work with the engineers at Duchêne’s design office to ensure stability, particularly as there was already a poorly documented cantilever in the foundations.

The interior design is intended to showcase the joinery’s expertise: full-height doors on solid timber frames, timber cladding, bespoke furniture…

Plenty to keep them busy

In Mons, Duchêne’s joinery has secured a contract to clad the interior of the railway station’s steel structure in timber. It is a significant challenge given the scale, with 1 km of cladding, and the unusual working height. Other projects Duchêne’s joinery can deliver in 2024, thanks to the talent of its teams, now working in the best possible conditions, include fitting out offices at the Agence du Numérique in Jambes and supplying several hundred doors for RTBF’s new building in Reyers. 

Project details

Client
Duchêne

Architect
Esquisse

Main contractor
Duchêne

Question about this story? Ask your question

Keep following this

Get an email when a new story is published. No account needed.

What you follow
  • ThemeFaçades and building comfort
  • SubjectProjects
Share this article

Follow on Construire la Wallonie

Follow

Follow a project or company and you’ll receive an email whenever a new story appears. Follow a theme or topic and you’ll receive a weekly roundup. No account or password needed: every email includes a link to what you follow.