Projects

Rehabilitating an inner-city block with clarity and ingenuity

Rehabilitating an inner-city block with clarity and ingenuity

An anachronistic, working pharmaceutical factory made up of a patchwork of buildings stood within Etterbeek’s dense urban fabric. In its place now stand 4 residential buildings, 2 fronting the street(s) and 2 within the block, developed by property developer Artone and its French partner Brownfields. Built in two years by main contractor BPC, this development showcases architect Nathalie Vandezande’s (NOHO Architecture) design for these high-end homes.

Above, the original site, with the area to be redeveloped marked by red dotted lines. Top, 3D visualisation of the project before construction.

It is a sizeable site: 4040 m², a stone’s throw from the Chasse district in Etterbeek. Following the demolition of the pharmaceutical factory, and the site’s decontamination and remediation, The Nest took shape as two street-facing buildings, scaled to match the existing buildings, and, within the block, a low-rise apartment block, designed not to encroach on the area’s sunlight, and two adjoining houses, set among greenery and a number of notable trees. In total, The Nest comprises 39 apartments and 2 houses.

The Nest buildings fit seamlessly into their urban surroundings.

High-end apartments and architectural design

“For all our projects, we want to deliver architecture we can be proud of: ambitious, contemporary architecture that nevertheless does not jar or seem out of scale, even for high-end apartments,” explains architect Nathalie Vandezande. “For the large street-facing building on the Cultivateurs side, we wanted to give it a contemporary identity while respecting the surrounding buildings, particularly in the dimensions of the windows. These were designed according to the distinctive proportions of the golden ratio, which are reflected in the traditional windows of older Brussels homes. This allows the new to engage with the old, while adding a contemporary touch that ties in with the neighbouring buildings.” 

“The architecture of The Nest is both understated and modern,” explains Arnaud Launoy, Project Manager at Artone. “It enables excellent insulation and meets the required energy performance standards.” The ‘little extra’ lies in the details chosen by the architect with the client’s approval. “For the façades, we opted for fibre-cement panels, creating black boxes on the ground floor and, above all, on the top floor,” recalls Nathalie Vandezande. For the developer, the contrast created by this choice produces a harmonious result: “We are proud of the strong identity achieved for these buildings,” says Arnaud Launoy.

One of the project’s distinctive features is the inclusion of two low-rise terraced houses within the apartment buildings.

Challenges on site

Building here involved extensive interaction with the various stakeholders and neighbours. It was therefore a demanding project, as Thomas Frère, project manager at BPC, confirms: “The difficulty was that the T-shaped site could be accessed via two one-way streets. A project of this scale inevitably causes disruption, with noise and constant activity. It therefore affected a great many local residents, whose homes adjoined the site.” For Nathalie Vandezande, the main problem was that the factory was still operating when the project began: “we could not access certain areas to carry out additional surveys.”

Other challenges also tested the patience of the clients and contractor, as Thomas Frère recalls: “As a result of the Covid-19 pandemic, which affected the project from start to finish, a shortage of timber for the floors forced us to find other suppliers, at additional cost, so that we could meet the deadlines. Delays in the delivery of building materials and finishing components following the blockage of the Suez Canal also affected us towards the end of the project.” “Thanks to our effective work with Artone, despite these challenges, we were able to hand over the apartments within a   “

timeframe very close to that estimated at the start of the project, and in the best possible conditions,” adds Dominique Stas, project director at BPC.

The low-rise building within the block, facing the street-facing building, which is distinguished by its black box on the top floor.

Effective collaboration 

The architect, Artone and BPC have worked together for many years. Their projects have always progressed smoothly, with demanding, skilled and people-focused partners building a genuine relationship of trust. All are very pleased with the quality of the work and the final result at The Nest. Residents and neighbours share this sentiment, now living in a place that is quieter, brighter, safer and healthier.  

The windows were designed according to the distinctive proportions of the golden ratio, which are reflected in the traditional windows of older Brussels homes.

Question about this story? Ask your question

Who worked on it

  1. ClientArtone et Brownfields
  2. ArchitectNathalie Vandezande (NOHO Architecture)
  3. Main contractorBPC

Keep following this

Get an email when a new story is published. No account needed.

What you follow
  • ThemeRenovating existing buildings
  • SubjectProjects
Share this article

Follow on Construire la Wallonie

Follow

Follow a project or company and you’ll receive an email whenever a new story appears. Follow a theme or topic and you’ll receive a weekly roundup. No account or password needed: every email includes a link to what you follow.