Police Station 2.0 for the Haute-Meuse Police Zone

After fifteen years of waiting, the police will leave the centre of Dinant and move into a new police station. A more functional and flexible workplace, a bright, pleasant building that is environmentally friendly yet easy to use, and economical to build, operate and, above all, maintain. All, of course, within a limited budget. Provisional handover, scheduled for June, will probably have to be postponed because of the impact of COVID-19.
The building was designed by the architects at Syntaxe, who already have considerable experience in this field. Their previous projects include police stations for the Basse-Meuse (Oupeye), Orneau-Mehaigne (Gembloux), Brabant wallon Est (Jodoigne) and Ouest (Rebecq) police zones.

The architects have managed to combine stringent security requirements with highly transparent buildings.
An accessible site
Next to the municipal workshops, Dinant’s recycling centre and a large retail outlet, the building will make it easier to set off on operations, despite being at the end of a cul-de-sac. Located on a gently sloping plot, it overlooks the Ciney-Dinant road and offers its occupants a fine view of the greenery. By positioning the building in the centre of the site, the architects maximised the setbacks and opened up views to the west and south. This has several advantages: the building is outside areas exposed to flood risk, while substantial areas around the project remain permeable, and scope for future expansion is preserved.
The siting also takes account of mobility and security constraints and requirements. The building presents a “small”
frontage to the public, who will initially be confined to the first quarter of the site. The main entrance is close to the site’s sole access point, guiding visitors along their route as intuitively as possible. Vehicle traffic is quickly divided into two flows, with the visitors’ car park closest to the entrance.

The cafeteria opens onto a terrace ideally located away from areas visible to the public.
Openness and security
The simple, balanced form serves a compact, ideally oriented project. This reduces the façade area, a genuine advantage in terms of construction costs, heat loss and maintenance. The construction principle is straightforward: a largely prefabricated reinforced-concrete structure (columns, beams, precast floor planks and hollow-core slabs) and a single façade concept, with regularly spaced openings and metal cladding.
The heart of the building is open over two levels. This open space is where staff routes intersect, close to the cafeteria, which itself opens onto a well-oriented terrace located away from areas visible or accessible to the public. A main staircase, separate from the service and emergency vertical circulation routes, welcomes users with an open invitation. It leads up to the first floor and the walkway at the junction between the departments and the area reserved for management. This projecting space, overlooking the staff entrance, provides continuous visual surveillance of the entrance used by service vehicles and staff.
The project includes a shooting range, an armoury and a cell complex. The systems and materials have therefore been adapted to meet very strict security and operational requirements. The same applies to the building’s façades, which feature bullet-resistant glazing, a secure airlock and more.

The building also houses a shooting
range with 4 lanes.
A focus on sustainability
Energy demand is minimised through an overall optimisation of the quality of the materials and the construction of the building envelope. High-performance technical systems have also been installed, including a balanced mechanical ventilation system with heat recovery, reversible heat pumps, LED lighting throughout and low-consumption sanitary fittings. In the future, photovoltaic panels could also be installed to make the heat pump systems energy self-sufficient.