Piscine Neptunium, Schaerbeek | Major refurbishment of the Neptunium swimming pool in Schaerbeek

Schaerbeek’s municipal swimming pool, the Neptunium, was designed by architect Laurent Senterre and opened in 1957. Sixty years later, it needed a major refurbishment to meet current safety and hygiene standards, as well as to improve its energy efficiency. The building is an example of 1950s modernist architecture, so its refurbishment had to respect this heritage.
The refurbishment, designed by the architectural practice Altiplan, was entrusted to main contractor Strabag Belgium. It comprised several phases: asbestos removal, work on the concrete structures, repairs to the waterproofing, renewal of the electrical installations, energy-saving measures and improvements to swimmers’ comfort.

Plans for the refurbished swimming pool.
Essential asbestos removal
“An asbestos survey was carried out by Fibrecount (the consultancy changed its name in 2014 and is now called Oesterbaai sa) in 2015,” explains Marianne Hiernaux, spokesperson for Beliris. “When work began in October 2017, the survey was updated so that an environmental permit application could be submitted to IBGE. Further quantities of asbestos were discovered, particularly in the suspended ceilings of the plant rooms. These areas were inaccessible in 2015 because the pool was still in operation. The additional quantities therefore had to be dealt with, and asbestos removal took longer than expected.”
Peter Nagels, Operational Manager at Oesterbaai: “Our consultancy offers a wide range of services relating to hazardous substances and materials. Among other things, we focus on asbestos surveys and inventories, consultancy and project management on construction sites.” Oesterbaai’s work here followed a standard process: a desk study based on existing plans and inventories, a site visit and identification, both visual and through sampling, of materials that might contain asbestos, followed by a full inventory with plans and photographs. But ‘standard’ does not mean ‘risk-free’. “Asbestos removal carries certain risks,” acknowledges Peter Nagels. “That is why this work must be carried out by specialist companies in accordance with strict guidelines, as set out in the regulations. If all these measures are followed, the risk to workers is manageable.”
He concludes: “I would like to emphasise the need for and importance of conducting a proper asbestos survey. Many people see it as an unnecessary extra cost, but it is better to include this cost in the project price at the outset than to face an asbestos problem when it is too late…”

The Neptunium during refurbishment.
A redesigned layout and refreshed interior
The interior finishes will be refurbished in keeping with the original architecture. The tiling, for example, will be made consistent in areas where original tiles have been mixed with more recent replacements, using materials from the original construction salvaged from areas due to be demolished. The small pool will be completely retiled. A surveillance system with underwater and overhead cameras will also be installed to help prevent drownings.
Improved insulation and energy-efficient heating
The façades and roofs will be insulated to make swimmers more comfortable and improve the building’s energy efficiency. The main roof will be completely replaced, while the secondary roofs will receive new waterproofing. The façades will be covered with thermal insulation and render. Some of the original metal frames with single glazing were replaced in 1997. The remaining windows on the side façades and in the stairwells will be replaced with aluminium-framed double glazing. The glazed roof will also be adapted.
The old heating system will be replaced with condensing boilers, and the ventilation system will be renewed. Air dehumidification will be provided by a heat pump, which will heat the ambient air, pool water and some of the domestic hot water. Apart from a few targeted technical interventions, the relatively recent pool water treatment systems will be retained.
The Neptunium is due to reopen in mid-2020.
Question about this story? Ask your question
Keep following this
Get an email when a new story is published. No account needed.
- ThemeRenovating existing buildings