Projects

People at the heart of every project, with efficiency as an added benefit

Texte Philippe Selke | Photos Ibens

La construction de l’extension (6720 m2) s’est effectuée sur 17 mois seulement, de novembre 2021 à fin avril 2023.
La construction de l’extension (6720 m2) s’est effectuée sur 17 mois seulement, de novembre 2021 à fin avril 2023.

For Aldea, Ibens completed an extension to the L’Heureux Séjour care home in May, two months ahead of schedule. Located midway between Beaufays and Sprimont, the extension adds 105 beds and 5 serviced apartments. It is an excellent example of efficiency, drawing in part on the experience of this Antwerp-based contractor, which specialises in healthcare and education. Going well beyond the traditional role of a main contractor, Ibens presents itself as a creator of socially valuable property solutions. Find out why and how.

The extension stands out from the outside for its combination of facing bricks and bio-based cladding boards with a high content of recycled wood fibres.

Ibens’s portfolio is packed with care homes and school buildings in the north of the country. Wallonia is now benefiting from its expertise: new care homes and extensions are already welcoming, or will soon welcome, residents in Rocourt, Sprimont, Tournai and Joncret (near Gerpinnes). Bart Cremie, CSO at Ibens: “The vast majority of our 70 employees are engineers. Our working method is unique in that we do everything we can to eliminate what are euphemistically called construction uncertainties, which drive up costs. From day one, we bring the client, architect, operator, … together around the table to develop an overall solution that all parties will then support. Rather than joining the process at the end of the chain, as is traditionally the case, we are involved from the outset. This allows us to take everyone’s expectations and needs into account when developing the technical aspects.” To achieve this, Ibens makes use of BIM and a high degree of prefabrication. 

For Aldea, Ibens completed an extension to the L’Heureux Séjour care home in Sprimont in May, adding 105 beds and 5 serviced apartments.

Efficiency in its DNA

Ibens manages construction through project managers, who act as the point of contact for the client. Luk Brughmans is one of them and is currently managing the Tournai project, having previously managed the projects in Rocourt and Sprimont. A site manager, supported by an assistant in Sprimont, oversees day-to-day site operations and coordinates partner subcontractors.

The project was carried out entirely using BIM, from earthworks to building services. This made it possible to optimise the building structure around the services and eliminate most of the costs associated with errors during construction. Ibens manages the BIM model entirely in-house and has its partners work within it to ensure overall consistency. 

Construction of the extension in Sprimont (6720 m2) took just 17 months, from November 2021 to the end of April 2023. The new building was connected to the existing one, requiring some work to the latter, primarily to ensure the essential continuity of the wireless networks between the two sections for staff convenience. The old building’s fire escape, located where the two buildings joined, was dismantled at the last minute, immediately followed by the opening of a new emergency exit in the new building, in consultation with the fire brigade. Luk Brughmans: “We went beyond the fire safety standards in force, particularly in the provision of automatic fire doors.”

The extension stands out from the outside for its combination of facing bricks and bio-based cladding boards with a high content of recycled wood fibres, a material championed by the architect for its appearance and for its fire resistance, which meets the standards without requiring any special treatment.

Specialising in projects with social value, such as care homes and schools, Ibens has unrivalled experience of both regulations and how buildings are used.

Innovation on every front

Ibens is constantly looking for ways to improve its efficiency further. Site managers, for example, have to take a range of measurements on a regular basis. To help them, Ibens is trialling a system in which cameras mounted on helmets compare the actual site with the BIM model, making it possible to detect potential discrepancies and document progress in real time. Even more surprisingly, the Sprimont site was visited by Spot, a robotic dog designed by Boston Dynamics. In collaboration with Buildwise, it was there to test a way of automating the surveyor’s setting-out work required to install the prefabricated walls on the raft foundation.

“Our knowledge of the day-to-day experience of users, young and old, as well as staff, is one of our strengths.”

Expertise shaped around users’ experience

Ibens’s specialisation in projects with social value, such as care homes and schools, gives it unique experience in these sectors, both in terms of regulations and, above all, how buildings are used. Bart Cremie: “Our knowledge of the day-to-day experience of users, young and old, as well as staff, is one of our strengths. We don’t want simply to build what we are asked to build. We want to work with the client and architect to ensure that the needs of users, neighbours, staff, investors, … are always taken into account, and then bring that shared vision to life as efficiently as possible.”    

Question about this story? Ask your question

Who worked on it

  1. ClientAldea
  2. ArchitectAtelier R
  3. Main contractorIbens

Keep following this

Get an email when a new story is published. No account needed.

What you follow
  • SubjectProjects
Share this article

Follow on Construire la Wallonie

Follow