People at the heart of a generous team project
Texte Philippe Selke Photos Kolorsprod

The non-profit organisation Point d’Eau is a Service Résidentiel Adultes (SRA), a residential service for adults welcoming people with disabilities or autism in all their diversity. Active since 1997, with its first residence in Grumelange, it called on the joint venture between Thomas & Piron Rénovation Bâtiment and Wust to build a second residence in Attert, to accommodate 30 additional residents. They are housed in five residential units grouped into two blocks, one for residents with multiple disabilities and the other for autistic people. This was a team project, delivering a result that meets a wide range of requirements despite financial constraints.
The two general contractors pooled their resources to build a single-storey building of around 3,000 m2 on land made available to the client by the municipality of Attert. Approximately 140 m long, it was designed by SIA (Société Internationale d’Architecture) with a distinctive layout comprising five residential units for six people each. Each unit has individual bedrooms, a shared living area, bathrooms and care rooms, as well as activity rooms. The client drew on its experience at the Grumelange site to refine certain aspects of the new project and provide infrastructure that was as well suited to residents’ needs as possible: separate spaces, outdoor areas, choice of lighting, careful acoustic design, accessibility, limiting through-traffic in the residential units, quiet spaces, and more. In addition to the residential units, the building includes a large multi-purpose room, a reception area, staff facilities, offices and several plant rooms.


Meeting challenges as a team
Thomas & Piron’s site manager explains: “The joint venture between Thomas & Piron Rénovation Bâtiment and Wust was responsible for Lot 1, covering construction of the building and some of the adjacent external works. Lots 2 (furnishings) and 3 (landscaping, roads and car park) were outside our scope. The main structure was built using concrete, precast elements and calcium silicate blocks. The numerous aluminium window frames and façade finishes comprise render over insulation. Some sections of the façade feature timber cladding. The roof build-up comprises 12 cm of PIR insulation and a TPO waterproofing membrane. Most of the floors are finished in PVC, with tiles in certain areas.”
The construction team’s main challenges were organisational, as it sought to keep to the schedule despite unforeseen site issues, and technical, in meeting the project management team’s requirements while staying within budget. For example, incorporating numerous rooflights set into large timber structures to bring in natural light and create additional interior volume proved challenging in terms of design and technical execution, particularly waterproofing. Unfavourable weather during the works made matters more difficult.

Optimising the design to tackle soaring costs
Cost-saving options, including changes to floor finishes, modifications to some electrical installations and architectural optimisations, were also thoroughly explored and implemented while preserving the building’s technical and architectural quality. Thomas & Piron Rénovation Bâtiment and Wust acted as advisers, helping the client make decisions throughout the project while taking account of financial constraints, which were exacerbated by the sharp rise in construction costs generally and material costs in particular.
Finally, the client entered into an agreement with a third-party investor to equip the building with heat pumps instead of the propane gas system originally planned, as well as numerous photovoltaic panels.
According to Wust’s Director of Works, close collaboration between all the stakeholders was essential to the project’s success: the client, “Le Point d’Eau”; the client’s representative (Cosep); the architect (SIA); the structural, building services and energy performance consultancy (SIX Consulting & Engineering), and others all worked hard to deliver this remarkable and generous project. The non-profit organisation Point d’eau moved heaven and earth, and continues to do so, to raise the funds needed, in addition to grants from the Region. It is still very pleased to receive donations, which are invaluable to its smooth operation. A “One brick = 1 euro” campaign is still under way. Full details are available on the organisation’s website.
Project details
Client
Point d’eau asbl
Architect
SIA
General contractor
AM Thomas & Piron Rénovation Bâtiment, Wust
Question about this story? Ask your question
Keep following this
Get an email when a new story is published. No account needed.
- ThemeRenovating existing buildings
- SubjectProjects


















