Papeteries phase 3, Genval | Drainage specialist dewaters excavation on former paper mill site

The 3rd phase of the ‘Papeteries de Genval’ project is under way on the site of the former factory of the same name. As part of the project, the industrial site is being redeveloped as a brand-new neighbourhood of apartments and commercial premises. As in phase 2, Franki Foundations was commissioned to carry out an excavation, and once again called on G. Smeyers to carry out the dewatering.
In Genval (Rixensart), the third phase of the project involves building 132 apartments in two developments. There will be two levels of underground car parks beneath the apartments.
This meant that an excavation approximately 5.5 m deep had to be dug over an area of approximately 5 250 m².
Soil prone to settlement
As in phase 2, Franki Foundations was commissioned to carry out the excavation and once again called on G. Smeyers of Zandhoven to carry out the dewatering.
“The ground is at +55 DNG, and the excavation reaches a depth
of 49.5 DNG. We had to lower the groundwater level from +52 DNG to +48 DNG, one metre below the excavation. This was achieved using secant piles,” explains René Lambrechts, director of G. Smeyers.
“The soil was not very permeable and was particularly prone to settlement, so we deliberately opted for the vertical gravity filter technique for the dewatering work.”

Given the large quantities of rubble present, the filters were installed through the drill stem, and the borehole was completely filled with drainage sand.
Eight piston pumps
“The filters were mechanically drilled to a depth of +43 DNG from a working platform at +53 DNG. Given the large quantities of rubble present, the filters were installed through the drill stem, and the borehole was completely filled with drainage sand.”
Installing drainage filters through the drill stem is not a routine operation, but G. Smeyers has several machines capable of carrying out the work without difficulty. G. Smeyers then connected the drainage filters, using suction pipes, to eight piston pumps with a capacity of 35 m³/h. This system dewatered the excavation to the required level without any problems, including the deeper excavation for the lift shafts.
A long-standing partnership
“The Papeteries de Genval project is an excellent reference for us and highlights the longstanding partnership between Franki Foundations and G. Smeyers, which goes back several years. We will soon be working together again on a new, relatively complex remediation project in Luxembourg,” concludes René Lambrechts.
Question about this story? Ask your question