The second office building in the Aquilis project, developed by Eaglestone and built by Thomas & Piron Bâtiment, was inaugurated in Jambes at the end of September 2021. Five high-quality floors of around 1,000 m², reflecting the standards the developer and contractor are known for, are designed to make employees want to return to their offices after a long period of enforced remote working.

The flexible floorplates allow each occupant to tailor the space to their needs. Engineering consultancy CSD Ingénieurs-Conseils was the first to move into the building. The interior fit-out was carried out by Buroconcept.

The story of Aquilis goes back to 2012, when Eaglestone bought a large plot in a strategic location along avenue du Prince de Liège in Jambes, initially to develop Atradius’s new headquarters. Convinced of the site’s potential, the developer expanded the scheme to include a residential section at the rear, allowing it to integrate more effectively with the existing urban fabric. Sophie Lambrighs, CEO of Eaglestone Belgique: “At the time, Eaglestone was not yet developing residential projects outside Brussels, so we transferred this section to Thomas & Piron Bâtiment, which has since become a long-standing partner on the project.” For the office section, the Brussels-based developer wanted the neighbourhood and future occupants to benefit from what defines its DNA: architectural and technical quality, artistic integration, … and to offer more contemporary offices than those available in Namur at the time. 

From the top floor, there are superb views over Namur and the cranes marking the construction sites under way, many of them run by Thomas & Piron Bâtiment.

Quality as a hallmark

After the Atradius headquarters (building D), developed to meet the client’s requirements, the plan was to complete the scheme with two more office buildings. The first, building A, has now been handed over. Sophie Lambrighs: “We started construction with the intention of accommodating several different tenants. In the meantime, the pandemic took its toll, dampening market enthusiasm. But we are now seeing that people returning to the office after experiencing remote working are finding it very difficult to work in outdated spaces, which has in turn increased demand for new buildings.”

Enforced remote working has increased demand for new buildings, where the principles of the ‘New way of working’ are put into practice.

Engineering consultancy CSD Ingénieurs-Conseils was among the first to show interest and moved into the building before it was fully completed. The fit-out by Buroconcept for this first tenant illustrates the flexibility of the spaces, which can accommodate any layout, including the latest configurations associated with the New way of working. True to its values, Eaglestone delivered high architectural and technical standards (BREEAM Very Good) with its partners Thomas & Piron Bâtiment and DDS+, enhanced in the entrance hall by a mural created by Namur-based art collective Drash.

Development of the site will only be complete once building B-C has been constructed. It will be comparable in size to the Atradius headquarters and twice as large as building A. Discussions are under way, and the quality, particularly the technical standard, will be raised another notch to meet the requirements of future occupants.

As usual, Eaglestone has incorporated a work of art in the entrance hall, here created by Namur-based art collective Drash.

A contractor on familiar ground

Thomas & Piron Bâtiment built building A alongside another major project in Namur: Belfius’s Walloon headquarters near the railway station. The construction method, with a prefabricated prestressed concrete structure, and the building services were very similar. “

The company’s in-house teams and some subcontractors worked on both projects in succession. As Xavier Maranzan, project site manager for Thomas & Piron Bâtiment, explains, the contractor was on familiar ground for several reasons: “Our partners on the project were not new to us. We had worked with the architects at DDS+ on the residential section at the rear of the site. And for structural engineering, consultancy Pirnay was already one of our regular partners. When you have worked together before and built a relationship of trust, you know what companies expect from you. That makes it easier to respond quickly.” The contractor was also familiar with the site itself and its constraints, having just completed the residential section. This had required groundwater lowering, and the equipment installed for that work could be reused for building A, allowing excavation to get under way without delay. Finally, Thomas & Piron’s teams are fully conversant with the various construction methods used. These include finishing elements such as raised access floors, common in office buildings, as well as HVAC systems such as radiant ceilings, which were also installed at the Belfius headquarters. Xavier Maranzan: “For Aquilis, as with most of our projects, we carried out a large part of the work using our own workforce. The range of trades represented within the company makes this possible, giving us considerable flexibility.”

High ceilings, floor-to-ceiling glazing, careful façade design, … the quality of the finished building is already apparent from the outside.

Despite the setbacks on site caused by the COVID pandemic, including a complete stoppage lasting more than a month, the overall schedule of 17 or 18 months was met to within a few weeks. This is testament to the efficiency of the contractor, based in Wierde. Sophie Lambrighs: “Our experience with them was excellent.” Fingers crossed, then, that Thomas & Piron can remain on familiar ground right through to the end by successfully completing the future building B-C… 

Question about this story? Ask your question

Who worked on it

  1. ClientEaglestone
  2. Partner and main contractorThomas & Piron Bâtiment
  3. ArchitectDDS+

Keep following this

Get an email when a new story is published. No account needed.

What you follow
  • SubjectProjects
Share this article

Follow on Construire la Wallonie

Follow

Follow a project or company and you’ll receive an email whenever a new story appears. Follow a theme or topic and you’ll receive a weekly roundup. No account or password needed: every email includes a link to what you follow.