Overlooking the Meuse valley at Loyers, strategically located beside the motorway in particularly green surroundings, Namur Office Park is a project that has been developed gradually since 2007. It now comprises five office buildings, joined by a Decathlon store (see previous article). Maintaining visual consistency between the latest building and its neighbours while ensuring the longevity of the structures installed was the challenge taken on by ALT Metallic Solutions, a family-run SME based in Tamines.

The five office buildings’ unified appearance is due in part to the cantilevered structures that crown them. These structures were designed to act as sunshades. Made of timber on the first four buildings, they deteriorate quickly, resulting in substantial annual maintenance costs because they are difficult to access (due to their height and distance from the road) and cover a large surface area.

Namur   Namur Office Park

From timber to metal

For the main contractor, ALT Metallic Solutions therefore installed sunshades on the fifth and final building using a more durable material. The project involved installing 2 structures measuring 30 m x 10 m and 16 m x 10 m respectively.

For the metal solution to be viable, it naturally had to fit the budget while also achieving an aesthetic similar to that of the timber structures. The sunshade therefore had to use profiles with the same dimensions as those on the four previous buildings to maintain a consistent overall appearance.

Namur   Namur Office Park

A new challenge for ALT Metallic Solutions

Philippe Ghilain, managing director: « Following the façade enclosure and the glazed roof of the Rive Gauche shopping centre in Charleroi, this project was another major architectural challenge for our family-run SME. Our team carried out the complete design work (preparing the drawings and supplying the structural calculation notes), manufactured the components in our workshop, developed an effective anti-corrosion system for large components and finally installed this giant structure on the roof. »

The primary profiles are 600 x 200 mm beams, while the secondary profiles measure 200 x 65 mm. These profiles are not available in the steel range.
Philippe Ghilain: « We therefore opted for welded plate girders (PRS), assembled from 4 plates cut from 6 mm-thick S355 steel using high-definition plasma cutting. We assembled and welded more than 700 plate components to make all the primary beams. For the secondary beams, which are not subject to mechanical loads, we chose extruded aluminium tubes to reduce the overall weight of the structure and take advantage of the material’s natural corrosion resistance. »

Namur   Namur Office Park

Hot-dip galvanising and a wood-effect finish

To provide effective corrosion protection, the steel components were hot-dip galvanised. Philippe Ghilain: « This stage was not without its challenges, as we had to ensure the holes were optimally positioned to allow the zinc bath to reach every box section in the beams. We also had to manage an extremely slow withdrawal from the bath to allow the zinc to drain without deforming the beam, which had not been designed to support the total weight of the zinc coating. To match the look of the four previous buildings, the beams and secondary aluminium profiles were painted dark brown.

Namur   Namur Office Park

A challenging installation

For obvious safety and ergonomic reasons, the various components were assembled at ground level into three sub-assemblies measuring 15 m x 10 m and weighing 8 tonnes. The three elements had different shapes and centres of gravity, and were individually unstable due to the combination of steel and aluminium components. The company therefore designed a lifting beam suitable for these operations, allowing the structures to be installed safely without deformation.

The final result is a real success, both aesthetically and economically. It has also provided ALT Metallic Solutions’ technical teams with valuable new experience in major architectural projects.  

Question about this story? Ask your question

Keep following this

Get an email when a new story is published. No account needed.

What you follow
  • SubjectProjects
Share this article

Follow on Construire la Wallonie

Follow

Follow a project or company and you’ll receive an email whenever a new story appears. Follow a theme or topic and you’ll receive a weekly roundup. No account or password needed: every email includes a link to what you follow.