Belgian group TPF Engineering employs around 4,000 people worldwide. For the Paradis Express project in Liège, it carried out a full consulting engineering assignment in building services, from preliminary design to final handover. Another excellent reference to add to an already long list of projects, all distinguished by recognised design quality.

A focus on wellbeing in the office

BREEAM Excellent certified, the office buildings achieve high energy performance through their building envelopes. As for the building services, somewhat unusual turbocore chillers were used. Their distinctive feature is that their performance improves as their load decreases. Cooling towers on the roofs, one per building, are discreetly integrated and further optimise performance. They can operate on their own in “free cooling” mode when the outside temperature is low enough, cooling the building’s chilled-water circuit without using the chiller. Jean-Pascal Bourdouxhe, engineer and project manager at TPF Engineering, explains: “The drawback of cooling towers is generally their water consumption. Here, on the banks of the Meuse, we are fortunate to be able to use drainage water, which we pump to supply the cooling towers. The same water is also used to supply the WCs and urinals.” More than 100 kW of photovoltaic panels have also been installed on the roofs, with a smaller array on the roof of the Yust hotel.

Radiant ceilings provide a high level of comfort for office occupants, while enabling the plant to operate with good coefficients of performance.

Although most of the building services are installed on the roofs, some can also be found, particularly the electrical services, in a small ground-level extension linking buildings B1 and B2. Once planted, this mound will blend seamlessly into the undulating landscape design and become virtually invisible. The office lighting is, of course, all LED and dimmable according to occupancy and the amount of natural light entering the buildings.

With workplace wellbeing also in mind, radiant ceilings provide a high level of comfort for occupants while enabling the plant to operate with good coefficients of performance. Some of the office space has been fitted out as coworking areas (Silversquare). The building services here are radically different, deliberately left exposed for a more industrial look. Radiant ceilings have been replaced by active beams, which allow the spaces to operate at similar temperature levels.

Energy performance and quality of life in passive apartments

Built to the passive standard, the apartments benefit from exceptionally high levels of insulation and airtightness. They are distinctive in that they use heat interface units. The condensing boiler produces heat and hot water on a single circuit. A heat interface unit in each apartment then uses this energy for heating or domestic hot water (DHW) production. This highly responsive system reduces heat losses from distribution and also avoids the risk of Legionella, since there is no domestic hot-water storage tank.

In the coworking area, the building services have been deliberately left exposed for a more industrial look.

Jean-Pascal Bourdouxhe says: “With the offices certified BREEAM Excellent and the apartments built to the passive standard, the bar for energy and environmental performance was set very high. We used state-of-the-art equipment, from the chillers and ventilation units to the heat and moisture recovery systems. Another challenge was to accommodate the needs of the different tenants as the project progressed. For example, the building that now houses the hotel was originally a conventional residential building. We had to adapt the building services, plans and so on to fit in with Yust’s requirements. Despite the project’s complexity, what stands out for me above all is the excellent collaboration with the architects Marc De Greef, Grégory Mathy and Jean-Yves Eischen, the structural engineers Hugues Wilkin and Agostino Giordano, and the client.”   

Question about this story? Ask your question

Keep following this

Get an email when a new story is published. No account needed.

What you follow
  • SubjectProjects
Share this article

Follow on Construire la Wallonie

Follow

Follow a project or company and you’ll receive an email whenever a new story appears. Follow a theme or topic and you’ll receive a weekly roundup. No account or password needed: every email includes a link to what you follow.