In Ath, EpiCURA spreads its wings

« Là où l’aile vitrée est en contact avec l’hôpital existant, notre chantier pénétrait dans ce bâtiment sur 2 ou 3 locaux, ce qui nous a obligé redoubler de vigilance. »
« Là où l’aile vitrée est en contact avec l’hôpital existant, notre chantier pénétrait dans ce bâtiment sur 2 ou 3 locaux, ce qui nous a obligé redoubler de vigilance. »

As part of its Crescendo project, EpiCURA has opened a striking extension to its hospital site in Ath. Brighter and better laid out than the existing building, the extension houses the dialysis department, as well as consultation rooms and meeting rooms. Contractor Duchêne has just completed the project, which took more than two years, having expertly delivered the structural shell and fit-out, as site manager Donato Marcheggiani explains.

The extension comprises two wings, one running for 85 m along rue Maria Thomé, and the other, entirely glazed, connecting to the existing building.

Practical completion was scheduled for the day after the interview. Confident, Donato Marcheggiani, for whom this extension was at the time the largest project in terms of value, was able to draw on Duchêne’s experience in the hospital sector, as well as his own. “A project like this looks simple in its geometry, with long corridors and rooms on either side, but a construction site is always a living thing. Our clients are themselves dealing with users, doctors and nurses, who make requests as the work progresses. So we have to reopen partition walls, reassign rooms, … and that is part of the job.”

The striking cantilevers were calculated and designed by engineering consultancy Fally.

Natural light and cantilevers

For Duchêne, work on the project began in January-February 2020 and was completed on 1 June 2022. The extension has a ground-floor footprint of 1700 m2 and comprises two wings, each with a ground floor and two upper floors. One runs for 85 metres along rue Maria Thomé, while the other connects to the existing building and takes the form of a 52-metre-long glazed gallery. Facing south, this wing features glazing with a solar factor G to prevent overheating, supplemented by an air-conditioning system.

Technically, the extension, built using a conventional beam-and-column system, presented no particular difficulties for Duchêne. Here too, natural light takes centre stage, thanks to no fewer than 170 windows in the impressive brick façade. The striking cantilevers were calculated and designed by engineering consultancy Fally. The timber structure was then expertly built by subcontractor Structure Wood. For the concrete section, Fally’s designs and Duchêne’s workforce got the job done. 

“A project like this looks simple in its geometry, with long corridors and rooms on either side, but a construction site is always a living thing.”

COVID as a complication

As we have seen, the main challenge lay in keeping to the schedule and coordinating the work. The project fell slightly behind schedule because of the COVID pandemic and the many essential but restrictive precautionary measures, particularly when working right next to an operational hospital site. No more than one person allowed in any room at a time, more site cabins so workers could take their lunch breaks, larger sanitary facilities that were cleaned daily, … a fairly strict set-up was put in place to comply with the regulations in force and protect workers’ health. This inevitably affected the schedule. Donato Marcheggiani recalls one critical phase: “Where the glazed wing meets the existing hospital, our site extended into the building across 2 or 3 rooms, which meant we had to work with airtight partitions, fans, temporary doors, a dust-control system, … What is already tricky under normal circumstances is even more so during COVID. We had to be extra vigilant.”

Natural light takes centre stage in the new buildings.

Close coordination

In addition, during the second phase of the project, Duchêne had to work alongside the company responsible for the specialist services, which posed a coordination challenge. In a hospital environment, standard building services are complemented by highly specialised systems. For dialysis, for example, a large reverse-osmosis unit distributes treated water to the various rooms. All these systems have to be integrated into the ceilings, partitions and furniture, … requiring close coordination. This was no cause for concern for Duchêne, whose experience, proposed methodology and commitment to the schedule were decisive when the contract was tendered.  

Question about this story? Ask your question

Who worked on it

  1. ClientEpiCURA
  2. ArchitectDDV
  3. Main contractorDuchêne (Groupe Eiffage)

Keep following this

Get an email when a new story is published. No account needed.

What you follow
  • SubjectProjects
  • CompanyStructure Wood
Share this article

Follow on Construire la Wallonie

Follow

Follow a project or company and you’ll receive an email whenever a new story appears. Follow a theme or topic and you’ll receive a weekly roundup. No account or password needed: every email includes a link to what you follow.