Projects

From design to installation: let there be light!

« Les verrières ouvrent la galerie vers l’extérieur. »
« Les verrières ouvrent la galerie vers l’extérieur. »

During the renovation of Westland Shopping Center, particular care was taken over its exterior appearance. New cladding has transformed the old concrete cube that once enclosed the mall. The creation of the glazed roofs, which bring natural light into the shopping centre itself, has added three light wells and a breath of fresh air to the Anderlecht mall. ALT Metallic Solutions played a major part in the project.

A superb blend of metal and glass

“We were involved in the renovation of Westland Shopping Center at three levels,” Mathieu Simon, project manager at ALT Metallic Solutions, tells us. “Overall, we carried out the design work, workshop fabrication, surface treatment and on-site installation.”

“We fabricated every component and installed it with great ease”

Custom-made louvres

ALT Metallic Solutions first designed and installed the exterior cladding: “We had to wait until the very last moment. The architects were undecided between two layouts, which depended on the spacing between each louvre. In the end, they chose both, varying the spacing to give the cladding, made up of metal slats of different heights and angles, the look of a sail caught by the wind. We fabricated every component and installed it with great ease,” says Mathieu Simon.

“These three glazed roofs are nearly 40 metres long, 12 metres wide and 4.6 metres high.”

ALT Metallic Solutions was also involved in creating the ground-floor entrances: “We fabricated and installed two steel-and-glass entrance structures. They provide access to the inside of the Shopping Center. These structures are approximately 12 metres long, 7 metres wide and 16 metres high,” Mathieu Simon continues.

“We fabricated and installed two steel-and-glass entrance structures.”

Open to the sky

But without a doubt, the most spectacular part was installing the three glazed roofs, which offer shoppers a uniquely bright experience. “These three glazed roofs, nearly 40 metres long, 12 metres wide and 4.6 metres high, required a great deal of work. They open the mall up to the outside. Despite their imposing size, we were able to install them fairly easily thanks to our experience and the layout of the site, as well as all the precautions taken by the site coordinators, who helped us work safely. We could also work during the day because tarpaulins stretched beneath the glazed roofs meant we did not have to worry about tools falling on shoppers,” Mathieu Simon explains.

“The cladding is made up of metal slats of different heights and angles.”

“We spent nearly three years on site, working day and night, but I have to say it was a real pleasure to contribute to the project. We got on perfectly with the other companies working on site,” concludes Mathieu Simon.

The end result is a real aesthetic success. It is also another positive experience for the technical teams at ALT Metallic Solutions in the field of large-scale architectural projects    

Question about this story? Ask your question

Keep following this

Get an email when a new story is published. No account needed.

What you follow
  • SubjectProjects
Share this article

Follow on Construire la Wallonie

Follow

Follow a project or company and you’ll receive an email whenever a new story appears. Follow a theme or topic and you’ll receive a weekly roundup. No account or password needed: every email includes a link to what you follow.