City Dox: a new mixed-use, ecological and intergenerational neighbourhood

Ideally located at the entrance to the city and alongside the Canal in Anderlecht, “City Dox” is a new 5.4-hectare mixed-use, intergenerational neighbourhood where new homes, both open-market and subsidised, will sit alongside shops, offices, businesses, a care home and a school, all in a leafy setting. Only pedestrians and cyclists can travel through it. Several architectural practices were commissioned to design the 7 blocks arranged around the public park. Main contractor BPC Group and architectural practice DDS+ delivered a landmark block: Block 3, completed at the end of 2021.

Contractor BPC Group specialises in large, complex, bespoke projects in Brussels and Wallonia. Maxime Dohet, Construction Director, coordinated the entire construction of Block 3, comprising an office building and two residential buildings. The passive building project includes 181 flats, 7800 m2 of offices and 4200 m2 of retail space. A total of 41 350 m2 of built area! Three basement parking levels provide 200 car spaces and 482 bicycle spaces.

A question of organisation
Other key figures include 17 500 m3 of concrete, 1500 tonnes of steel, 19 000 m2 of screed and 2000 doors… BPC Group coordinated the project from start to finish and engaged around fifty subcontractors. Work began in August 2019 and practical completion was achieved in October 2021. Two years is a short time for a project of this scale, especially with the Covid crisis… “It was an extremely fast-paced project, a real challenge,” says Maxime Dohet.
“An average of 150 workers were on site, with 13 people overseeing the work. The health crisis made things more complicated, but the site only shut down once. After the first lockdown, work resumed with teams organised into smaller groups. Everything went well and we met the deadlines.”

“To keep up the pace, we divided the project into several packages and brought in more subcontractors so they could work at the same time and help limit the risks. In addition, our speciality is off-site and on-site prefabrication of concrete elements, which helps optimise construction methods. For the finishing works, we use the LEAN method to manage the schedule on a daily basis, with regular internal quality checks and ongoing monitoring. We also held pre-handover inspections of the flats with the buyers: they were able to visit their homes three months before handover and raise any issues, which avoids remedial work later because the clients are satisfied. This method demands a great deal of rigour at every level.” “
With a focus on ecology and sustainability, BPC Group developed an energy self-sufficient site office: a container fitted with solar panels and a wind turbine houses the site foreman’s office and moves up from floor to floor as construction progresses. Environmental considerations also shaped the clean-up of this former industrial site: 15 000 m3 of contaminated soil was removed by barge along the Canal.

Sustainability and mixed use
Luigi Bellello, partner architect at DDS+, and Ana Palau, the DDS+ architect in charge of the City Dox project, also prioritised sustainability and energy savings.
“This is one of the largest mixed-use projects built in Brussels, part of the Canal Plan to give a new purpose to this neighbourhood of industrial wasteland. An entire former industrial district is being redeveloped,” explain the architects at DDS+. “The buildings meet high energy performance standards, but they are also part of a different, genuinely mixed way of life, bringing together homes, both owner-occupied and subsidised, production areas occupied by non-polluting small industries, shops and offices. All these occupants share the site on different levels, around the central patio, a garden with a vegetable plot on the first floor.”
“We gave a great deal of thought to environmental considerations, first during the site clean-up, then in the choice of materials: natural, high-quality materials such as stone, brick and metal. The bricks are Belgian-made. As well as being high-quality and durable over the long term, these materials will make future dismantling and reuse (or recycling) far more straightforward than other options, such as ETICs systems, in terms of the building’s life cycle and the circular economy. For insulation, much of the building uses mineral wool, a more sustainable material than petrochemical insulation. All the roofs are fitted with photovoltaic panels. Rainwater is collected, as is greywater, from which heat is recovered to warm the water used in the sanitary facilities.”
The office building’s energy consumption is limited by recessed horizontal strip windows, particularly on the south and south-west façades, which maximise natural light while providing protection from the sun. “We also designed the building for adaptability: thanks to its simple structure, it can be converted into flats without having to be demolished. The project as a whole is therefore aligned with sustainable development. We placed great importance on greening the inner courtyard and creating visual openings from the public spaces towards this greenery. A genuine green corridor has been created between the different blocks…”

Question about this story? Ask your question
Who worked on it
- ClientImmobilière de la Petite Ile (Atenor)
- ArchitectDDS+
- Main contractorBPC Group