Projects

Architectural concrete adorns Droogdokkenpark

Architectural concrete adorns Droogdokkenpark

Anyone looking to enjoy a unique view of Antwerp from an equally exceptional location should visit Droogdokkenpark in the het Eilandje district, nestled in a bend of the Scheldt. The 18-hectare site in the north of the city has been transformed into a metropolitan park and green space. Ebema, a manufacturer of high-quality concrete paving materials, was commissioned to produce the concrete staircase and benches.

Thanks to its unique position along the outer bank of a bend in the Scheldt, the site connects the city with the port. Droogdokken Island comprises a natural bank along the Scheldt on one side and the adjoining dry dock area on the other. The Belvédère, the first part of the park, opened at the end of September 2018: an architectural viewpoint covering 2 hectares and shaped as a hexagon. Vlaamse Waterweg nv built a new quay along the Scheldt, seamlessly integrated into the platform. AG VESPA and the city created a lawn planted with 65 trees above it, as well as a perimeter walking path and a square at the entrance to the Belvédère. A car park with 90 spaces was also provided near Kattendijk Bridge, the future access point to the park.

The Belvédère, the first part of the park, opened at the end of September 2018: an architectural viewpoint covering 2 hectares and shaped as a hexagon.

Hexagonal park

AG VESPA is coordinating the redevelopment of the Scheldt quays across the various sectors and, together with the city, creating the public realm. The Droogdokkenpark concept was designed by Van Belle & Medina Architects and Vogt Landscape Architects, while Artes Group is acting as main contractor.
“During the tendering period, we received requests from various parties to submit a bid. Artes Group was one of them, and ultimately won the contract,” explains Maarten Mathijssen, product manager at Ebema. “In consultation with Artes Group, we reached an agreement on the purchase of the various elements.”

One of Droogdokkenpark’s greatest assets is undoubtedly its location. Maarten Mathijssen explains: “The park is situated on the outer bank of a bend in the Scheldt, offering views of both the city and the port, with the MAS and the monumental Port House behind you. Access to the hexagonal park is via an impressive staircase built from elements manufactured by Ebema. Arranged together, these separate elements form steps and benches. On the other four sides, facing the lock and the Scheldt, we designed benches where visitors can sit or stand to admire the river.”

Architectural concrete

The staircase and benches are made of architectural concrete. “It is a high-quality material with an equally high-quality finish,” says Maarten Mathijssen. “Architectural concrete has a much more refined composition than, for example, concrete intended for industrial applications. It plays an important aesthetic role, as this project clearly demonstrates. For staircases in public spaces, a non-slip surface is essential. Rather than adding a layer on top, which would have detracted from the appearance, we chose to acid-treat the surface to create a non-slip finish. This enabled us to build a safe staircase without compromising the beauty of the architectural concrete.

Arranged together, the elements that make up the staircase form steps and benches.

The aggregates used became visible again when the top layer was treated, which had significant consequences. Maarten Mathijssen explains: “The shade of the black aggregates in the samples developed for the project proved too strong. We then joined forces with our aggregate supplier to find a grey alternative, which was no easy task. The aggregates came from a quarry that closed soon afterwards. What we were still able to extract from the quarry was just enough to build the staircase. Finding a sufficient quantity of aggregates in that specific shade and starting production of the elements on time was therefore quite a challenge.”

Constructive collaboration

This project required close coordination and meticulous follow-up. “That is precisely one of Ebema’s strengths. Our first priority is to deliver a compliant, high-quality and durable product that meets the client’s requirements. We also contribute our ideas. For major projects such as this one, we produce full-size samples, for example, so the client can provide feedback. Once the project is complete, we remain available to resolve any issues that may arise. Clients greatly appreciate our personal approach. Another thing I noticed is that, during site visits, we were able to find solutions in a very collaborative way. What I will remember from this project is the constructive collaboration with Artes Group and the whole team,” concludes Maarten Mathijssen.   

Question about this story? Ask your question

Keep following this

Get an email when a new story is published. No account needed.

What you follow
  • SubjectProjects
Share this article

Follow on Construire la Wallonie

Follow

Follow a project or company and you’ll receive an email whenever a new story appears. Follow a theme or topic and you’ll receive a weekly roundup. No account or password needed: every email includes a link to what you follow.