An exceptional renovation for an exceptional building

At 13 Rue des Poissonniers in Brussels, a 1930s building that had retained most of its original features and materials has been renovated. This painstaking work has restored the building to its extraordinary former glory.
The building, occupied until the 1980s, was in very good condition, as its previous occupants had neither damaged nor renovated it. “Tribeca, a company active in asset management and portfolio management, bought the building for an English group,” explains Christian
Sibilde, partner architect (and co-founder) at DDS+. “The brief we were given was very straightforward: to turn an office building into an office building.”

Some of the building services were left exposed.
The magic of the place
In the 7-storey building, everything dated from the original period and was almost entirely in its original condition: parquet flooring and marquetry, walls, ceilings, light fittings, doors and locks… “On the ground floor, there was Belgian red Vinalmont marble, a material that is now almost impossible to find, as well as white and black marble,” explains Christian Sibilde. “Our practice has extensive expertise in both major and minor renovations. For this project, which covered almost 4,000 m2
, we had to carry out both light renovation work and restoration beyond the usual standards. For the construction phase of this highly specific project, we brought in a small team of former colleagues, ADR Architectes.”

The building, seen from the street.
High occupancy density
The project was therefore ‘limited’ to renovation work, specialist building services, façade cleaning and major finishing work. Christian Sibilde explains: “We quickly obtained the environmental permit, but later had to obtain a planning permit to build a second fire escape. One staircase was not enough given the high occupancy density planned for the offices (+/- 6 m2/person).” Spaces (Régus group), which leases the entire building, specialises in luxury office rentals, flexible and comfortable coworking spaces, and creative meeting rooms. The renovated Poissonniers building, with its high-class interior, was the perfect fit for its Spaces Stock Exchange location.

In many rooms, the original marquetry was retained, or the wooden floors beneath it, which were cleaned and waxed.
Preserving the old while renovating
As part of the renovation, it was of course necessary to meet current compliance standards, particularly for ventilation, while preserving comfort, the quality of the spaces and the existing ceilings. The architects opted to avoid standard suspended ceilings that would hide the original mouldings and decorative details, leave services exposed, and retain the original marquetry and old floors.

The building, seen from the inner courtyard.
A bouwteam approach
The respectful renovation was matched by excellent collaboration between all the parties involved. Christian Sibilde explains: “We worked in a genuine bouwteam spirit with the contractor, Simonis. The company was also very mindful of the building and its component parts.” The architect concludes: “Although the building is neither listed nor included on a heritage protection list, we received congratulations from the Brussels heritage administration on the renovation.” Another feather in the cap for the architects, the general contractor and the various trades that worked in succession at 13 Rue des Poissonniers.
Question about this story? Ask your question