La Tour Agro de Louvain-la-Neuve a été complètement rénovée par Artes Group.
La Tour Agro de Louvain-la-Neuve a été complètement rénovée par Artes Group.

From 30 September 2019 to the end of November 2021, the Tour Agro « De Serres » building in Louvain-la-Neuve underwent a much-needed major renovation. Designed as the student town was being built, Tower B dated from the 1970s. The building houses part of UCL’s Faculty of Agricultural Sciences and the Earth and Life Institute. Gunther Genette, project manager at Artes TWT, explains how the contractor delivered this ambitious renovation from start to finish.

« We first stripped the load-bearing structure back to its bare frame. It is a mushroom-slab structure, consisting of reinforced concrete slabs supported by columns with flared heads that transfer the loads. The original design featured imposing prefabricated concrete balconies, metal partitions inside and a 15 cm-thick concrete suspended ceiling, with all the building services running through them », explains Gunther Genette.

The project involved creating new laboratory spaces for the Faculty within the existing structure, retaining the building’s mushroom slabs but removing the suspended ceilings, which added weight to the building and reduced daylight. 

All the building services, renewed to suit the use of the spaces, are now exposed and concentrated in the corridors.

A large part of the work involved stripping each floor back, removing the perimeter elements of the balconies, stripping all the façades and then gradually dismantling the suspended ceilings. The original prefabricated elements were stacked on top of one another and had to be dismantled in a carefully defined sequence, with little headroom for access by machinery. « We also had to work around the fact that the existing slabs could only take a limited load. The dismantling had to be organised so that rubble and machinery were not concentrated in one place. In the end, all that remained was the load-bearing structure: the columns and slabs across the building’s five floors », continues Gunther Genette.

Timber cassettes and glazed walls

The building was then insulated externally and fitted with a new façade made up of timber cassettes and curtain walls, all clad in timber. « We recreated the building envelope and the façade alignment. Unlike the original design, it is timber rather than concrete that takes centre stage in this new version of the building. After extending the foundations, we created a continuous new façade line in front of the floor slabs, significantly reducing thermal bridging. Half of the building’s envelope consists of insulated timber cassettes clad in timber. The rest of the building has glazed walls. A walkway set 1 m 50 in front of these curtain walls provides external access, including for window cleaning. Finally, open-jointed timber slats form the finished building envelope. These slats create a kind of relief and protect the building from direct sunlight. » The walkway structure was subject to an in-depth study to transfer loads through the curtain-wall profiles while ensuring thermal separation and complete watertightness. 

A walkway provides external access, including for window cleaning.

Ventilation and acoustics

In addition to the new external envelope, a substantial amount of work was carried out inside, with more than 7000 m2 of floor area to refurbish and around 6000 m2 of partitions to build. Two floors are used for reception areas (large open spaces), laboratories and practical classrooms. Two further floors remain occupied by laboratories for researchers and PhD students, while the top floor consists of offices and open-plan space. 

« We completely redesigned the layout of each floor », says Gunther Genette. « A large part of the work involved coordinating and installing the specialist services for the laboratories (fume cupboard management, various gas supplies, provision and connection of laboratory furniture, etc.). We also had to coordinate these specialist services with the required finishes. » All the services are now exposed but concentrated in the corridors, freeing up the rooms. 

« To optimise the layout of the exposed services, we used BIM software with our subcontractors, particularly to anticipate potential issues on site, such as clashes and congestion between services. In the end, the technical data was added to the as-built model, which the client can use to maintain the building if they wish. »

Particular attention was also paid to acoustics. « Several site meetings focused on what needed to be done to achieve the required acoustic performance. The absence of suspended ceilings makes noise management more challenging. To meet this challenge, we used double-leaf partitions up to 22 cm thick and made steel connections between the joinery and the partitions. »

At the start of the year, students moved into the refurbished Tour Agro, while Gunther Genette has been back working in Louvain-la-Neuve for the past three months. Artes Group is responsible for the complete renovation of Théâtre Jean Vilar. Another great project to manage…  

Question about this story? Ask your question

Who worked on it

  1. ClientUCLouvain
  2. ArchitectModulo architects
  3. Main contractorArtes TWT

Keep following this

Get an email when a new story is published. No account needed.

What you follow
  • ThemeRenovating existing buildings
  • SubjectProjects
Share this article

Follow on Construire la Wallonie

Follow

Follow a project or company and you’ll receive an email whenever a new story appears. Follow a theme or topic and you’ll receive a weekly roundup. No account or password needed: every email includes a link to what you follow.