A deceptively simple project

It had been talked about for more than 15 years, but this time it has finally happened! The former 6,000 m2 industrial building acquired by the City of Charleroi on the ACEC site has been refurbished and fitted out to house archives and works of art, as well as the staff responsible for these collections. The extensive refurbishment, carried out by contractor Duchêne (Groupe Eiffage), ultimately took two years. Once all the archives and works of art are in place and the surrounding area has been landscaped, all that remains is to bring the memory of the past to life!
Charleroi municipal archives and museum stores

The refurbishment had three aims: to bring the archives, previously spread across several locations in the city, together in suitable conditions; to create a storage area for the Musée du Verre and the Beaux-Arts; and to accommodate various City services, including the cleaning department.

Construction site challenges
Started 2 years ago, work was suspended for a long time, first because of the coronavirus pandemic, then because of a permit suspension. Emmanuël Franc, Building Director for Hainaut at Duchêne: “Initially, as far as the exterior was concerned, our brief was simply to give the façades a new lease of life. But they turned out to be in worse condition than expected, so we had to replace all the metal cladding. “
On the roof, we insulated the existing steel decking and covered it with an EPDM membrane. We also made the load-bearing steel structure fire-resistant.”
Inside, the building had to be fitted out to fulfil its purpose: it now has no fewer than 27 km of motorised shelving for the archives (see following article), a set of mobile mesh panels for hanging paintings in a climate-controlled space, as well as offices.
The building services were also redesigned, with humidity control and heating systems offering a high degree of tolerance for paintings and the city’s valuable collections.

Deceptively simple
Looking at the result, you might think it was all straightforward. Appearances can be deceptive: the challenges lay in certain details of the execution. Take the flatness of the power-floated concrete floor, for example: “The floor is power-floated and, around the rails, care must be taken to avoid creep, which would impede the movement of the motorised shelving.” In addition, for the shelving to move, the floor level must be rigorously consistent across the entire surface, far more so than in a conventional industrial hall. “As we were working on an existing slab, we had to compensate for differences in level using concrete overlays and resins.”
Another challenge was bringing the building up to fire safety standards. Treating the steel frame with intumescent paint is straightforward, but creating fire compartments within this steel structure, with its numerous bracing elements, was much less so. In addition, in the archive hall, bracing obstructed the escape routes. In some places, the steel frame therefore had to be modified to meet the building evacuation requirements without affecting its stability.

Constructive dialogue
Duchêne’s advantage on this project was its ability to combine expertise in industrial hall construction with its refurbishment know-how. The work on site was led by Borriero Patricio, a particularly experienced site manager, with strong support from Gérard Louis, works supervisor. Duchêne carried out the structural work with its own workforce, while the cladding and building services were subcontracted to specialist companies.
Emmanuël Franc: “We were fortunate to deliver this project in full collaboration with the City, through constructive dialogue, which was important given the surprises we encountered. The City was rigorous but fair. It continually worked with us to find solutions.” This helped bring about the result that the public will soon be able to discover at Technopôle La Villette.

Question about this story? Ask your question
Who worked on it
- ClientVille de Charleroi
- ArchitectVille de Charleroi
- Main contractorDuchêne (Groupe Eiffage)