Projects

A confident industrial aesthetic for a new training venue

Au niveau de la toiture du R+2, une extension a été construite et habillée de métal déployé gris anthracite, véritable fil rouge des interventions visibles de l’extérieur.
Au niveau de la toiture du R+2, une extension a été construite et habillée de métal déployé gris anthracite, véritable fil rouge des interventions visibles de l’extérieur.

Among the many construction projects currently under way in Charleroi, the conversion of the former boiler house at the Université du Travail is noteworthy for several reasons. Part-funded through the 2014-2020 ERDF programme, the renovation and conversion of this 7-storey building for IFAPME was carried out by contractor Duchêne, covering the structural works, structural stability and external works, based on plans drawn up by architects Baumans-Deffet. The new spaces, fitted out across 2500 m2 of floor space, are intended for training in design, creativity, sales and commerce.

The defining feature of this distinctive building, dating from the early 20th century, is that it was built to house the heating plant for the Université du Travail. This explains the presence of imposing steel structures that once supported the two coal-fired boilers. The architectural interventions were designed to respect this industrial aesthetic. All the steel structures were retained, protected against fire with intumescent paint, and then painted.

The façades were cleaned and the external joinery replaced with much higher-performance solutions.

Steel, concrete… and timber 

Patricio Borriero managed the project for Duchêne. Work began in June 2020 and was completed in early September this year: «The load-bearing structure, which was oversized when built, was in good condition and was retained. We simply removed a metal deck at level +1 and replaced it with an insulated concrete slab, for acoustic and fire-resistance reasons. This required extensive propping from level -2. We used fair-faced formwork, as requested by the architect. The existing steel walkways were fitted with new guardrails for safety.» 

An extension was also built on the roof at level R+2, after the small building that stood there was demolished. It comprises two classrooms, a cafeteria and a terrace, all with a steel structure and curtain-wall cladding, like some of the façades. According to Patricio Borriero, building this extension 20 metres above ground was one of the project’s main challenges. The existing external staircase, which served as a fire escape, was stripped back and fitted with the same anthracite-grey expanded metal cladding, a defining feature of the interventions visible from outside. 

Inside, the brightness of the space is striking, complementing the timber used to separate the classrooms from the vast central exhibition space, like a series of boxes within a box. The lightweight construction method required no structural reinforcement. Several workshops are located around the perimeter of the large central spaces, while offices and administrative rooms were fitted out at level +1, again using a timber frame. 

The steel roof structure and walkways were retained, protected against fire with intumescent paint, and then painted.

Project constraints and unforeseen issues 

The building now has two entrances. An existing ‘upper’ entrance connects to the Charleroi campus, while a new ‘lower’ entrance links rue de la Broucheterre to level R-1 via a new external staircase. «To ensure the staircase was stable, we had to use micropiles,» explains Patricio Borriero. 

All the existing joinery was replaced with frames and glazing offering improved thermal performance, airtightness, acoustic performance and mechanical strength. Patricio Borriero: «The window-frame supplier went bankrupt during the project, which unfortunately caused a delay of a few months. Other than that, everything went as planned.» 

Another conversion project, then, for contractor Duchêne, which has plenty of experience with this type of work. Patricio Borriero: «I have personally had the opportunity to refurbish a former industrial hall to house the archives of the City of Charleroi. For the conversion of the Boiler House into training spaces, I was able to rely on Philippe Soltysik, an experienced renovation site manager. That proved invaluable given the scale of the internal alterations, which included cutting new openings, among other work. My colleague Louis Gérard oversaw the finishing works. We had previously worked together on the refurbishment of the City’s archives.»

We will have to wait until the opening, scheduled for before the end of this year, to see the renovated building come to life.   

Question about this story? Ask your question

Who worked on it

  1. ClientIFAPME
  2. ArchitectBaumans-Deffet Architecture et urbanisme
  3. Main contractorDuchêne (Groupe Eiffage)

Keep following this

Get an email when a new story is published. No account needed.

What you follow
  • ThemeRenovating existing buildings
  • SubjectProjects
Share this article

Follow on Construire la Wallonie

Follow

Follow a project or company and you’ll receive an email whenever a new story appears. Follow a theme or topic and you’ll receive a weekly roundup. No account or password needed: every email includes a link to what you follow.