After a two-year construction project, Belfius’s new flagship in Wallonia is now moored alongside Namur station. Built by Thomas & Piron Bâtiment for developers ARTONE and Brownfields, the 6000 m² above-ground office building, with its striking architecture by BAEB, now stands at the junction of avenue des Croix de Feu and avenue des Combattants. Acquired by Belfius Banque, it is set to become the financial institution’s regional headquarters.

The building has 7 above-ground floors and rises in a tapering form, offering magnificent views over Namur. Three very open semi-underground parking levels, thanks to expanded metal cladding, complete the development. By designing the façades as a perfect repetition of a constant glazing and aluminium module, architect Emmanuel Bouffioux has created a magnificent building whose form and choice of materials will ensure it stands the test of time.
Teamwork for maximum efficiency
As a developer on other projects, Thomas & Piron Bâtiment has in-house design teams that enable it to get involved in projects at a very early stage. The contractor took the same approach with its client ARTONE. Benjamin Vermeersch, deputy director responsible for projects outside the development business at T&P Bat: “
“We made all our technical teams available to the developer, including coordinators, site supervisors, estimators and quantity surveyors, so we could work hand in hand with the design team, including the architect, structural engineer and building services engineer. This allowed us to finalise an execution package that enabled us to meet the budget we had initially priced on the basis of the planning permission alone and a few additional technical documents. We were fortunate to know the whole team, particularly the architect, with whom we had already worked on other projects. There was an atmosphere of trust from the outset, which always makes things easier.” As well as defining a clear budget, this approach enabled the contractor to gain a very good technical understanding of the project before work even began, and to prepare the construction phase thoroughly.

A project with multiple constraints
Numerous constraints made the project particularly complex, including the site’s confined location between railway lines and boulevards. Jérôme Morelle, senior site manager at Thomas & Piron Bâtiment: “We carried out excavation work 1,20 metre from the tracks towards Brussels and Charleroi. This created difficulties for our teams with materials handling, but above all required constant vigilance around Infrabel’s infrastructure to prevent damage.” The ground also proved highly heterogeneous, with alternating layers of shale and softer areas, leading SETESCO to design a 90 cm thick raft foundation. “
The prefabricated frame was then erected in partnership with supplier Ergon. Along avenue des Combattants, a retaining wall of secant piles was built, while the walls alongside the railway line towards Brussels were reinforced with shotcrete. All this in a very confined space…

For the structural works, the biggest constraint was handling the 197 aluminium cassette modules manufactured by Limeparts for the flat façades. Jérôme Morelle: “We worked with lifting platforms positioned around the perimeter of the building, following a sequence that allowed us to clear the area at the foot of the building quickly, so that work could be carried out on the landscaping, among other things. This was done by Frateur, of Bossière-Gembloux. We had 30 people on site for the structural works. At peak, we had 80 people working on the finishing and façades.” A project on this scale inevitably involves many subcontractors, including Dumay-Canard of Philippeville for the external aluminium joinery, and Pirson Montage of Liège for the expanded metal cladding of the car parks. T&P Bat can also rely on its own teams for the building services installations, which accounted here for around 16 000 hours of work. Benjamin Vermeersch: “We have more than 120 workers specialising in building services, which helps us work more efficiently, even during construction. Our workers know the quality standards to be met and are also responsible for maintaining the installations afterwards.”
Together with Créagora and Aquilis (phase II), other office projects in the Namur area, as well as the Delta at the Confluence, T&P Bat is demonstrating its credentials as a contractor for all types of buildings. The approach clearly meets its clients’ expectations, as they keep coming back with new projects.
Artone, proud to have initiated a sustainable project in the city centre
To provide Belfius with a new, detached building in the heart of the Walloon capital, developer Artone joined forces with French environmental investment fund Brownfields, which specialises in the redevelopment of industrial sites. After 2 years of complex construction work, the entrance to the city of Namur has been transformed, with a strikingly designed building offering numerous benefits to its users, including bright workspaces and proximity to the train and bus station as well as the RAVeL.
Laurence De Meulder, Project manager at Artone: “After securing the site, we took the time to design this unusual building, tucked away in the heart of the railway lines. The demolition, remediation and construction all required collaboration between the various parties involved, including Infrabel, and that collaboration was excellent. The demolition work was completed in a single weekend to avoid disrupting rail traffic. This is a project we are particularly proud of, as it is the first building to initiate the redevelopment of an entire city district. We are delighted with the excellent collaboration with Thomas & Piron Bâtiment, architect BAEB and Belfius. Together, we rose to the challenges of this unprecedented project and are very pleased with the result.”
With AERMEC, Italy is a European champion… in air conditioning
To cool and treat the air in the Belfius building in Namur, Thomas & Piron called on ENERWIN, the exclusive importer of Italian manufacturer AERMEC in Belgium and Luxembourg for around a decade. Product quality and responsive service have been key factors.
For this project, Thomas & Piron’s teams ordered, installed and connected a 480 kW chiller with its air coolers, an air handling unit with a capacity of 37 000 m³/h, 8 air conditioners for the data rooms on the various floors and several fan coil units in the offices. ENERWIN-AERMEC technicians then commissioned the equipment.
Lionel Mendel, technical and commercial director of ENERWIN-AERMEC: “We need to stop believing that the Germans are the only ones who make quality products. Did you know that 80% of chillers sold that are manufactured in Europe are made in northern Italy? Since March 2015, AERMEC has had Europe’s largest certified test chamber there.” AERMEC’s credentials are impressive. Founded in 1961 and employing nearly 2000 people across all continents, AERMEC is one of the world’s leading air conditioning companies. Prestigious buildings such as the World Trade Center in Brussels, the British Museum in London and the Centre Pompidou in Metz have also chosen AERMEC to ensure the comfort of their users.
Technical details
Clients
ARTONE (Uccle) and Brownfields (Paris)
Architect
Bureau d’architecture Emmanuel Bouffioux BAEB (Molenbeek-Saint-Jean)
Main contractor
Thomas & Piron Bâtiment (Namur)
Question about this story? Ask your question
Keep following this
Get an email when a new story is published. No account needed.
- ThemeTransforming infrastructure and territories
- SubjectProjects