Fire safety at Liège’s Halles des Foires assured with fire-resistant access covers

Work on the new Halles des Foires is now in full swing. With the creation of the Rives Ardentes eco-district on the Coronmeuse peninsula, the Halles des Foires are moving to the Bressoux multimodal zone. BPC Group is delivering the project as part of a temporary joint venture with CIT Blaton and Moury. ACO, a specialist in water management, is supplying its products and expertise for the fire-resistant access covers, and later for the oil separators.
Designed to host trade fairs, exhibitions, shows and conferences, the complex has a total floor area of 19 500 m², laid out as flexible spaces that can accommodate one or more events at the same time. In addition to high-quality facilities, the building will also feature an extensive parking area and landscaped spaces. A large public square at the entrance to the building will also provide a venue for various events.

TopTek Uniface
Fire safety is, of course, a priority in every construction project. ACO offers a range of solutions for this purpose, from cast iron covers and gullies for outdoor multi-storey car parks to simpler tiled covers suitable for both indoor and outdoor use. For example, TopTek Uniface tiled covers are suitable for use in or around buildings where a high standard of design is required. TopTek Uniface is designed for tiles up to 15 mm thick. The covers must be filled with concrete of the required grade (C35/45) to achieve the specified load-bearing capacity. They can also be fitted with gas struts to assist with opening.
For this project, ACO supplied 800×800 stainless steel TopTek Uniface SS/FR access covers, with a load class of up to N250, suitable for forklift traffic, and a fire resistance rating of 120 minutes. ACO TopTek Uniface SS/FR access covers are designed to provide a practical and safe means of access to underlying spaces where fire resistance is required. They are intended for industrial and infrastructure applications and help protect buildings and structures in the event of a fire. When a fire breaks out, closing ACO’s fire-resistant access covers protects the area above or below the cover, making a significant contribution to protecting rooms and floors.
A unique solution
Jürgen Kayser, project manager at ACO, explains: « The client approached ACO with a very specific request: a certified fire-resistant cover. With TopTek Uniface SS/FR, ACO has the ideal solution. While contractors usually make a cover fire-resistant by fitting it with a fire-resistant panel, the major advantage of TopTek Uniface SS/FR is that it is made in one piece. Another requirement was for the cover to be filled with concrete so that only the edge would be visible. That was no problem either. The combination of the right product, the required fire resistance and ease of installation provides significant added value for the client. »

A well-established range
SWECO, the engineering consultancy responsible for the project, is pleased with its cooperation with ACO. « SWECO is responsible for the project’s MEPF design. In practical terms, this means we are responsible for the building services: heating, ventilation and air conditioning, electrical systems, plumbing, sprinklers and lifts. The challenge is to integrate the building services and fire safety properly into the architect’s design. The aim is to combine the building’s appearance with its functionality, so that people can evacuate safely in the event of a fire. As an engineering consultancy with broad and in-depth expertise, we work with the architect to find solutions that bring their design, their vision, to life. We carry out independent, high-quality building services studies. The architect or contractor chooses a specific product on the basis of the technical specification. ACO has a well-established range of products, including separators and covers, which are widely available on the market. »
As well as the fire-resistant covers, ACO is supplying other products for the project in Liège: « For example, some of our oil separators are due to be delivered. ACO has also already supplied cast iron gullies. These, like the fire-resistant covers, have already been installed. This is a major project for ACO, showcasing our strengths and the added value we offer clients », concludes Jürgen Kayser.
Een zakelijke vraag aan ACO? Get in touch
Companies in this story
Keep following this
Get an email when a new story is published. No account needed.
- ThemeBuilding and site safety and security
- SubjectNews
- CompanyACO



















