Excavation work without breaking the bank? How?

This advice may seem strange. And yet, if I can offer you one tip... always hire the largest excavator possible!
You may think I’m trying to drive up your costs. Just take a look at our website and you’ll see why: the larger the machine, the more expensive it is to hire. However, in many cases, the exact opposite is true. Choosing the right machine, which may mean a slightly larger one, can save you quite a lot of money. In this blog, I’ll explain exactly why.
Once you know what the job involves and where it needs to be done, you can work out what size machine you’ll need. Naturally, you can’t use a 15-tonne machine to landscape a small city garden. That simply wouldn’t work. Conversely, choosing a (too) small machine for a large-scale job will waste a great deal of time and fuel.
A small machine will need to be repositioned more often during the job. For example, you’ll need to move a 2-tonne machine twice as often as a 10-tonne one, because the latter has a much greater working radius. Moving a machine takes time and uses fuel. And while you’re moving it, you’re not digging.
Here’s a quick calculation to illustrate the point:
- With a 1.5-tonne machine fitted with a grading bucket about 1 metre wide, you move around 100 litres per bucket and 4 buckets per minute. However, once you factor in the need to reposition the machine, the actual rate is 3 buckets per minute.
- At 6 hours of intensive work, that amounts to 108 m³ per day. Daily fuel consumption will be around 20 litres. That works out at 0.185 litres per m³ of soil excavated.
- With a 10-tonne machine fitted with a 2-metre grading bucket, you move around 450 litres per bucket and 3.5 buckets per minute. Once you factor in the necessary repositioning, the actual rate is 3 buckets per minute.
- At 6 hours of intensive work, that amounts to 486 m³ per day. Daily fuel consumption will be around 40 litres. That works out at 0.08 litres per m³.
This example shows that a 10-tonne machine works more than 4 times as fast and uses only half as much fuel per m³ moved as a 2-tonne machine.
Once again, this is a theoretical example of a job that doesn’t exist. But the differences are so large that it’s worth thinking twice before choosing a machine.
Naturally, there are several factors to consider when choosing your machine.


ENVIRONMENTAL FACTORS
How large is the plot? There’s more room on a property than in a city garden. Do you need to work inside a building, or under trees or power lines? Take height restrictions into account. Do you need to dig alongside a wall, road or railway line? In that case, choose a short-tail excavator. Are you working on a construction site or a golf course? Leaving tracks on a construction site isn’t a problem. On a golf course, it will be much less welcome.
THE SCALE OF THE JOB
You don’t need a 15-tonne machine to dig a hole for a trampoline. You do need one to dig the foundations for a very large farm.
TRANSPORT COSTS
Transporting a machine can quickly become expensive. The cost of a low-loader carrying a 15-tonne machine can be significantly higher than that of a trailer carrying a 2-tonne machine. You’ll probably finish sooner with the 15-tonne machine, but in this case, the advantages, faster work and therefore a shorter hire period, don’t outweigh the disadvantages, namely the high transport costs. “Bigger” doesn’t always mean “better”.
Looking to hire an excavator in your area? Visit www.graaver.com to see the range and prices!
This blog was written by Graaver in collaboration with Dick Kroesbergen