Foundations

Combined expertise and experience for a construction pit ready for use

Combined expertise and experience for a construction pit ready for use

Work is under way in Kapellen, a municipality in the Antwerp Campine, on a new-build project for Meyvis. The site, formerly home to a Citroën garage, will be redeveloped with 30 new apartments. The project was designed by architect Stijn Mertens and is being delivered by client Hooyberghs (B&R Bouwgroep d’Arendonk). The temporary consortium Smeyers, Van Rooy, Aertssen has the knowledge and experience required to manage the dewatering works, including the design study, as well as the retaining and earthworks. “

Spaciousness, finish and energy efficiency are the key priorities for the Meyvis project. All the new apartments will have heat pumps, underfloor heating and a modern ventilation system to keep energy bills down. “An E20 energy rating means all the homes qualify as BEN and benefit from a reduced property tax for five years,” we are told. All the apartments will have spacious, sunny terraces. The project has firmly opted for sustainable technologies and high-quality finishes. 

The temporary consortium Smeyers, Van Rooy, Aertssen has the knowledge and experience required to manage the dewatering works, including the design study, as well as the retaining and earthworks.

Complex dewatering

But before the first stone can be laid on this impressive project, the site needs to be prepared. For this, the project called on the specialist expertise of Smeyers, Van Rooy and Aertssen, which joined forces in a temporary consortium. “Smeyers is responsible for dewatering, Van Rooy for the retaining works and Aertssen for the earthworks,” explains Bert Creve, operational manager at Smeyers. The task is complex. A construction pit needs to be created, and the site also needs to be remediated because it is contaminated. Smeyers handled the entire study. “Our engineering department can develop a dewatering design and prepare the permit application for the client.”

The study showed that this would not be a standard dewatering operation. Bert Creve explains: “To limit the flow rate and the extent of the contamination, a watertight retaining wall around the construction pit is recommended. Sodium silicate is then injected into the ground to retain the water and limit the groundwater level within the pit. Van Rooy built the water-retaining barrier to a depth of 12.5 m. Injecting sodium silicate into this type of soil is relatively unusual. The works will soon get under way, putting the tests carried out beforehand into practice. The remediation is also managed by the temporary consortium, which ensures the pit is ready for the client.”

Cutter soil mix

In mid-April, Van Rooy began constructing the cutter soil mix wall, a process in which the in-situ soil is cut and mixed with water and cement. Once it has hardened, the resulting panels form an underground wall. This wall acts as a barrier to water and soil. “We first install the water-retaining barrier, then inject the sodium silicate and start dewatering,” explains Tim Eggermont, discipline manager foundations at Van Rooy. “Although each member of the temporary consortium has its own specialist expertise, we have regularly discussed the project together. That is the only way to find the best solutions, both for the foundations and for dewatering. Smeyers developed the design, and we assessed its feasibility together.”

The remediation is also managed by the temporary consortium, which ensures the pit is ready for the client.

Numerous parameters

Van Rooy carried out the stability study. The project involves around 2,000 m² of soil mix, installed over a length of 162 linear metres and to a depth of 12.5 linear metres. 10 tonnes of reinforcing steel are required, and Van Rooy is also installing the anchors and micropiles. In short, a complete foundation package. Bert Creve explains: “When using sodium silicate, you cannot install just any type of dewatering system, and certain strict conditions must be taken into account. For example, the depth of dewatering is very important, and sufficient distance must be maintained from the injection points. Pumping rates must be increased gradually to limit the risk of clogging. These are parameters that need to be monitored closely. To ensure efficiency, we are using horizontal rather than vertical dewatering.”

Groundwater level after 30 days of dewatering.

A turnkey solution

This complex project showcases the expertise of Smeyers and Van Rooy, both of which are part of Aertssen Group. Bert Creve explains: “Combining different techniques made it possible to deliver the project within the terms of the permit. The design is therefore crucial. And having everything under one roof is a major advantage. We have our own engineering department and extensive expertise in combining techniques to provide a turnkey solution. These techniques are unfamiliar to traditional contractors.” Tim Eggermont agrees: “Having all the parties within the same group makes the temporary consortium more flexible when it comes to planning and risk coverage. That benefits everyone.”   

Question about this story? Ask your question

Keep following this

Get an email when a new story is published. No account needed.

What you follow