Time is free, but priceless

Imagine a construction site in a major urban centre, or in a densely populated metropolitan area. Now imagine organising it, especially when the area imposes numerous constraints: restrictions on working hours, logistical difficulties caused by traffic restrictions, noise pollution and dust.
How MB crushing equipment helps construction sites finish work on schedule
And let’s not forget one of the most pressing issues today: the difficulty of finding raw materials and obtaining them quickly.
In short, finishing the work by the delivery deadline is often difficult. If not managed properly, these constraints have a major impact on the site and can lead to late delivery and the associated penalties, higher fixed costs, downtime caused by delays in sourcing and delivering materials, and disruption for traffic and local residents.
Ah, time, that thing there’s never enough of!
But let’s stop imagining and look at what happened on three construction sites in urban centres that faced the same problems. Three different sites on three different continents, with three different solutions.
Site number 1: how to speed up the whole process
We are in Epinay sur Seine, France, on a demolition site surrounded by houses and roads. It was therefore out of the question to block traffic for long periods or slow it down with lorries coming and going. But materials for the foundations and backfill were urgently needed. In fact, there was no shortage of inert materials: demolition of part of a building had produced reinforced concrete, brick, plaster and render waste.
Reduced in volume using a BF80.3 crusher bucket mounted on a Yanmar SV100 excavator, these materials were immediately ready for reuse on site.
So that the work could be completed on time.
Site number 2: how to avoid lorries and traffic jams
We are travelling to China, to Jiangsu province, to a rather unusual construction site above a metro station. Blocking traffic or having We are travelling to China, to Jiangsu province, to a rather unusual construction site above a metro station. Blocking traffic or having too many lorries entering and leaving the site would have caused major disruption and extended the delivery time. Here too, suitable materials were needed quickly to fill the new structures. A BF80.3 was again mounted on a Sany 215 to reduce the size of the rubble: no more waiting for materials and no more lorries coming and going, all to the benefit of local traffic.
Site number 3: how to have materials ready to use immediately
In New York State, a house literally collapsed after heavy snowfall. The roof could not bear the weight of the snow and caved in, destroying the entire porch. The only option was to dismantle what remained and rebuild the house. Using a John Deere 180G and an MB-G1200 grapple, the contractor sorted the timber and stacked it in a lorry, while the cement was loaded into another.
A MB-S14 screening bucket was then used to screen the rock and soil, providing materials ready for use in the new construction.
To strengthen the foundations, they used an MB-S14 screening bucket to separate the rocks and soil around them, then reduced the rocks and waste to the right size for the new foundations.
Everything stayed on site.
Question about this story? Ask your question
Companies in this story
Keep following this
Get an email when a new story is published. No account needed.
- ThemeTransforming infrastructure and territories
- SubjectNews
- CompanyYanmar