News

Aboreal invests in converting several former industrial sites in Hainaut into housing, with more than 600 flats in total

Aboreal invests in converting several former industrial sites in Hainaut into housing, with more than 600 flats in total

With five major new projects in the region (Mons, Soignies, Dour and Tournai), Aboreal is tapping into growing interest in revitalising former urban brownfield sites.

Numerous projects under way

The “Arborescence” project in Soignies, on the former “Technigum” industrial site, is firmly rooted in a vision for urban regeneration. Close to the centre of Soignies and its railway station, it includes green spaces, a pedestrianised square, 7 apartment blocks with a total of 160 flats, and 15 shops. The first two phases have already been a great success, with further phases under way and homes available in 2023 and 2025.

A second project, “Les Maisières”, is ideally located opposite SHAPE in Mons and close to major roads. The final phase comprises 155 flats, built on the site of a derelict hotel. The project has been a success, with only around twenty flats left for sale.

“L’orée de Bozière” is another Aboreal project in central Tournai. It comprises 149 flats next to the railway station, on the former “Dunlop” site. The first phase consists of 46 flats, ranging from studios to spacious penthouses with terraces. Sales are under way, with the first homes scheduled for completion in 2025.

In Dour, on the site of the former cable works, the eponymous “les Câbleries” project involves refurbishing four buildings and constructing two more, providing a total of sixty-two flats. Going on sale this year, the project was developed with the A7 architecture practice and aims to preserve the region’s historic industrial heritage while offering a range of energy-efficient homes.

The benefits for local residents, councils and future occupants are numerous:

  • Revitalising a neighbourhood
  • Remediating contaminated land
  • Preserving undeveloped land
  • Taking advantage of locations close to public transport and town centres
  • Providing homes that meet the latest energy standards

Le Chant de l’Orée in Saint Symphorien: a more rural project

The largest project announced by Aboreal is “Le Chant de l’Orée”, in Saint-Symphorien (Mons). It comprises 7 houses and 6 small apartment blocks, each no more than three storeys high. Developed with Atelier d’Architecture Michel Bognanno, the project is intended to broaden Aboreal’s offering with a more rural development. It responds to local demand by creating more spacious homes with attractive terraces.

An open day will be held on Saturday 22 April from 9h to 12h at a show flat at 189 rue Grande in Maisières, where the project will be presented. Visitors will be able to view the plans and ask any questions about purchasing a new-build property.

Practical information:

  • Date: 22 April 2023
  • Time: 9h to 12h
  • Address: Rue Grande 189, Maisières
  • For further information: www.aboreal.be

Question about this story? Ask your question

Keep following this

Get an email when a new story is published. No account needed.

What you follow
  • SubjectNews
Share this article

Follow on Construire la Wallonie

Follow

Follow a project or company and you’ll receive an email whenever a new story appears. Follow a theme or topic and you’ll receive a weekly roundup. No account or password needed: every email includes a link to what you follow.