July 2021: in Esneux, the Ourthe flooded the ground floor of the Trois Couronnes care home to a depth of 1.60 m, forcing the evacuation of all residents and their urgent relocation to other care facilities. Since then, following extensive renovation work, they have been able to return to their home, which has meanwhile been freed from all fossil fuels. As part of this refurbishment and modernisation, Sotrelco proved to be a true partner in HVAC and plumbing design and engineering for client Armonea, main contractor Balcaen and consulting engineers Mates (now Amares).
The centrepiece of Sotrelco’s expertise is the solution devised for domestic hot water production. When Armonea questioned whether it made sense to reuse the existing solar thermal panels or replace them with photovoltaics, Mates, on Sotrelco’s advice, recommended the former option. The panels allow the water to reach higher temperatures for most of the year, with a smaller loss in efficiency than photovoltaics. However, the existing solar thermal panels were replaced with new, more efficient models.
Sotrelco’s solution uses a system in which the domestic hot water storage tank is first heated by the panels via a lower coil, then supplemented by the heat pumps via an upper coil. The tank also contains an electric heating element to provide the thermal disinfection cycles needed to control Legionella when sunlight is limited.
This approach, prioritising solar thermal energy and electricity via heat pumps, effectively decarbonises heat production for domestic hot water and space heating, fully aligning with a sustainable energy-efficiency strategy. It also responds to the municipality’s requirement to phase out fuel oil, which caused hydrocarbon pollution during the floods.

A long, sustainable life
Thierry Maertens, project manager at Sotrelco, points to another sustainable feature of the project:
«An existing well made it possible to pump water from a depth of 15 m, below the level of the Ourthe. We tested it and suggested that the client use the water for toilets and outdoor irrigation, as the layout made it difficult to install large rainwater tanks.»
Sotrelco brought its expertise to bear on many other crucial aspects of the building services, including optimising the heating system. The initial heat output calculations of 20W/m³ were reduced to 10W/m³ after the existing façade was insulated. Although various options were considered, including ventilation heating, underfloor heating and active ceilings, the final decision was to heat all the bedrooms with convector heaters.
Frédéric Piret-Gérard, architect at Amares (formerly Mates): «With Sotrelco, we also installed an above-ground wastewater treatment plant in the courtyard behind the building, as the whole street is in an area without a public sewer. This replaced a buried treatment plant, which nobody wanted after the unpleasant experience of the floods.»


Vertical redistribution of functions and raising the building
The improvements to the building went beyond its technical systems. Lessons were learned from the floods. In 2017, Armonea had asked Mates to bring the spaces up to current standards. The floods occurred just as work was about to begin, prompting the architects to rethink certain aspects. The building services plant was therefore relocated to the roof, and a lightweight steel-framed storey was added. On the ground floor, no technical equipment is now located below a height of one metre, with the exception of the underfloor heating, which is embedded in the screed and therefore protected from flooding.

Bouwteam and BIM collaboration
Sotrelco was able to play such a significant role in designing the HVAC systems thanks to the deliberate choice of a bouwteam approach, without detailed technical specifications. BIM facilitated close collaboration between the partners, and Sotrelco made particularly effective use of the Revit model initiated by Mates, enabling precise coordination and clear visualisation of service routes. Frédéric Piret-Gérard: «As our hallmark is architecture that integrates building services from the outset, working in Revit comes naturally to us. We were pleasantly surprised to find that Sotrelco shared the same philosophy. After working with them on a care home in Lobbes, we were pleased to work together again, this time in a role that went far beyond that of a mere installer.»
Thierry Maertens adds: «Although BIM coordination for the ventilation package was not initially our responsibility, we eventually took it over, as ventilation is the most demanding system in terms of space.»
In conclusion, Sotrelco clearly demonstrated HVAC engineering expertise that went well beyond installation alone, benefiting the quality of the project and earning the full satisfaction of its partners. Frédéric Piret-Gérard concludes: «For us as architects, it is very important to maintain a constructive collaborative attitude towards contractors. Being able to rely on the skills and commitment of an installer like Sotrelco is invaluable… and makes for a better working atmosphere.»