Luxembourg

A triangle of “mobility, light and views” for workplace wellbeing

Texte Philippe Selke Photos Eaglestone

Construit sur une parcelle a priori complexe, de forme triangulaire, l’immeuble de bureaux PRISM est venu enrichir le quartier historique de la Cloche d’Or à Luxembourg.
Construit sur une parcelle a priori complexe, de forme triangulaire, l’immeuble de bureaux PRISM est venu enrichir le quartier historique de la Cloche d’Or à Luxembourg.

Built on an apparently challenging triangular plot, the PRISM office building, with 7,480 m2 of floor space and BREEAM Excellent certification, added to Luxembourg’s historic Cloche d’Or district in early 2024. PRISM was designed to let in light and provide remarkable views of nature, promoting workers’ wellbeing. Matthieu Leyder, Head of Design & Build at Eaglestone, outlines the key strengths of this high-quality project within the developer’s strategy in the Grand Duchy.

Founded in 2015, Eaglestone Luxembourg has established itself in less than ten years as a key player in property development in the Grand Duchy. Whether residential or commercial, every project by the developer, which is also active in Belgium and France, stands out for its bold architecture, strategic vision for the region and strong focus on innovation. The Arc, The Nest, PRISM… a series of landmark developments that embody this ambition. 

Wellbeing first

Having worked with the architecture practice before and knowing its capabilities, Eaglestone entrusted the design of its PRISM project to the Luxembourg branch of Assar Architects. Matthieu Leyder explains the project’s defining features: “Optimising floor areas means making use of 100% of the buildable area while bringing in as much natural light as possible, and offering maximum flexibility in the spaces. And that is something Assar has done very well. We knew the daylight calculations, but the reality exceeded our expectations.” Energy performance and occupants’ wellbeing were also priorities, particularly in terms of appropriately sized offices and the comfort provided by the building services. While the heating and cooling systems are conventional, the ventilation system is not. Matthieu Leyder continues: “Supply and extract air are handled in the same office zone, rather than through a random, centralised extraction point. Air is extracted locally to ensure optimum distribution, including in terms of acoustics.”

The elegant building also stands out for its reconstructed concrete façade, its garden-level and rooftop terraces, and its high-quality interior fit-out. The flexible spaces allow a range of layouts for tenants, who can rent half-floors.

PRISM was designed to let in light and provide remarkable views of nature, promoting workers’ wellbeing.

Developed speculatively

Confident in the building’s quality, its strategic location (including access by free public transport) and its market position, Eaglestone began construction without a tenant or investor in place, a rare practice in Luxembourg’s property sector, at least before the crisis that recently hit the sector. The decision reflects a deliberate strategy to anticipate the market recovery and respond quickly to future demand. The building is currently almost 95% let, with 86% leased to a single tenant (CBRE), demonstrating that the strategy has paid off. The flexible spaces and focus on sustainability are increasingly sought after by businesses looking to secure a sustainable future. 

Going beyond requirements

The developer is known for its determination to go beyond standards for sustainability and energy efficiency. The PRISM project also served as a starting point for more ambitious environmental initiatives on other projects, particularly the reuse of materials. The Nest is one example. Matthieu Leyder says: “Although the Grand Duchy’s environmental requirements are sometimes more advanced than those in force in Belgium, local reuse supply chains remain limited. We could not find supply channels suited to our needs, so we turned to Belgium and France to source the reclaimed materials we needed. For the PRISM project, with no alternatives available in sufficient quantities, we ultimately opted for new raised access floors.”  

Project details
Client Eaglestone
Architect Assar Universum Architects
Main contractor Thomas & Piron Bau

Question about this story? Ask your question

Keep following this

Get an email when a new story is published. No account needed.

What you follow
  • SubjectLuxembourg
Share this article

Advertisement

Follow on Construire la Wallonie

Follow

Follow a project or company and you’ll receive an email whenever a new story appears. Follow a theme or topic and you’ll receive a weekly roundup. No account or password needed: every email includes a link to what you follow.