Infrastructure

E42-E19/A7: Mons: overnight works to replace noise barriers near Nimy towards Charleroi

E42-E19/A7: Mons: overnight works to replace noise barriers near Nimy towards Charleroi

As announced, work to replace the noise barriers alongside the E42-E19/A7 at Nimy (Mons), towards Charleroi, will begin on the evening of Sunday 10 August. The work will be carried out exclusively at night to minimise its impact on traffic and will provide a lasting improvement to local residents’ quality of life.

EQUIPMENT TO REDUCE NOISE DISTURBANCE

The new acoustic panels will be installed alongside the E42-E19/A7, bordering the carriageway towards Charleroi at Nimy (Mons), over a distance of approximately 1,5 km. The project involves removing the entire existing structure and installing a more effective noise barrier along the full stretch.

This refurbishment of the existing infrastructure will significantly improve residents’ acoustic comfort. In total, more than 5,700m² of noise barriers will be installed to provide a lasting reduction in noise from the motorway.

As a reminder, intervention areas are identified on the basis of strategic noise maps for road infrastructure, assessed against the limits set out in the Walloon Government Order of 22 December 2016 and the population affected. They are also determined by an asset-management approach, with works required to renew infrastructure on the network.

The noise barriers selected to provide a lasting reduction in noise will be made of sound-absorbing concrete and will look like this, matching the barriers installed on the same motorway towards France.

CHANGES TO TRAFFIC CONDITIONS

From this Sunday 10 August until the end of the year, traffic on the E42-E19/A7 at Nimy, towards Charleroi, will be restricted to a single lane from 20h to 6h30 every night from Sunday evening to Friday morning, with a maximum speed limit of 70km/h.

De video laadt pas als je op afspelen klikt.

Question about this story? Ask your question

Keep following this

Get an email when a new story is published. No account needed.

What you follow
  • SubjectInfrastructure
Share this article

Follow on Construire la Wallonie

Follow

Follow a project or company and you’ll receive an email whenever a new story appears. Follow a theme or topic and you’ll receive a weekly roundup. No account or password needed: every email includes a link to what you follow.